Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
10/06/2022
Applicant:
Helen Ormsby
Description:
SFR DRHOH30M21 T21-M0041

Permit Reviews

Permit Number - T22CM07682
Permit Status: Issued
Permit Description: SFR DRHOH30M21 T21-M0041
Start Date Submittal Complete Date Status  
06/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/22/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM07682
Permit Status: Issued
Permit Description: SFR DRHOH30M21 T21-M0041
Total Outstanding Activity Conditions - 2
Date Name
10/06/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/06/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2018-112(P21WP00113) IS ACCEPTED ANDRELEASED BY PCRWRD

Conditions

Permit Number - T22CM07682
Permit Status: Issued
Permit Description: SFR DRHOH30M21 T21-M0041
Date Description Comments
10/06/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/21/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/21/2023 Post-Tension Inspection Report is required.
06/21/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM07682
Permite Description: SFR DRHOH30M21 T21-M0041
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/27/2023 COT - LCBU - Framing N/A Partial Pass Partial per intermediates. 4/27/2023
04/27/2023 COT - RSEL - Construction Power N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM07682
Permit Description: SFR DRHOH30M21 T21-M0041
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/24/2023 COT - RSPL - Rough Soil Passed
03/24/2023 COT - RSPL - Yard Water Line Passed
03/24/2023 COT - RSPL - Sewer Passed
04/05/2023 COT - RSBU - Preslab Passed okay for concrete placement in slab. 4/5/2023
04/05/2023 COT - RSEL - Electrical Underground Passed
04/05/2023 COT - RSBU - Excavation/Rebar/Zoning Passed okay for concrete placement in slab. 4/5/2023
04/05/2023 COT - RSEL - Grounding/Bonding Passed
04/25/2023 COT - RSBU - Roof Nailing Passed
04/27/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Approved. Corrections were made. 4/27/2023
05/11/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/11/2023 COT - LCPL - Plumbing Intermediate Passed
05/11/2023 COT - RSPL - Gas Pressure Test Passed
05/11/2023 RSME - Mechanical Progress Passed
05/24/2023 COT - HCBU - Interior Shear Bracing Passed
06/15/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 6/15/2023
08/29/2023 COT - RSPL - Plumbing Final Passed
08/29/2023 ENGR Engineering Final Passed double staked plantings need nursery stake removed. A/C unit needs leveled. paint residue needs removal.
08/29/2023 RSBU - Building Final Passed
08/29/2023 COT - RSME - Mechanical Final Passed
08/29/2023 COT - RSEL - Electrical Final Passed
08/29/2023 COT - RSEL - Outdoor Lighting Passed
08/30/2023 COT - BULD - SWG Clearance Passed