Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
10/05/2022
Applicant:
Kevin Flaherty
Description:
SFR CASITA2X2 T20-M0045

Permit Reviews

Permit Number - T22CM07651
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Start Date Submittal Complete Date Status  
10/05/2022 OTHER 10/05/2022 ACTIVE Review Details
05/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/10/2024 APPROVED Review Details
11/30/2022 RESIDENTIAL NEW DWELLING v.1 11/30/2022 APPROVED Review Details

Conditions

Permit Number - T22CM07651
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Date Description Comments
10/05/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/05/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/05/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/10/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/10/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM07651
Permite Description: SFR CASITA2X2 T20-M0045
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/12/2023 COT - RSPL - Gas Final N/A Not Applicable
10/12/2023 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: T22CM07651
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 17
Date Description Inspector Results Comments
01/12/2023 COT - RSPL - Rough Soil Passed
03/29/2023 COT - RSPL - Sewer Passed
03/29/2023 COT - RSEL - Electrical Underground Passed
04/13/2023 COT - RSBU - Preslab Passed
06/20/2023 COT - RSPL - Yard Water Line Passed 6/20/23: ok to back-fill
07/31/2023 COT - RSBU - Roof Nailing Passed
07/31/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/30/2023 COT - RSBU - Interior Shear Bracing Passed
10/30/2023 BULD - Electrical Clearance Passed 10/30/23: 9125 E Catalina Hy, Build 13
TEP ECO
04/11/2024 COT - FCON - Sprinkler - Final Passed
04/11/2024 COT - RSEL - Electrical Final Passed
04/11/2024 COT - FCON - Fire - Final Passed
04/11/2024 COT - RSPL - Plumbing Final Passed
04/11/2024 RSBU - Building Final Passed
04/11/2024 COT - RSME - Mechanical Final Passed
04/15/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
2X2 TRUSS CALCS_V1.PDF DOCUMENTS VIEW
2X2 TRUSS LAYOUT_V1.PDF DOCUMENTS VIEW
SIC BLDG 13.-2024-05-07_V1.PDF DOCUMENTS VIEW
SIC BLDG 13-2024-05-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION T22CM07651_V1.PDF DOCUMENTS VIEW
CONS-1_SEWER CONNECTION BLDGS 4-13_V1.PDF DOCUMENTS VIEW
CONS-1_SEWER PLANS - BUILDINGS 4-13_V1.PDF DOCUMENTS VIEW
1_SIC BLDG 13-2022-11-30_V1.PDF DOCUMENTS VIEW
CONS-1_WATER PLANS - BUILDINGS 4-13_V1.PDF DOCUMENTS VIEW