Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
10/05/2022
Applicant:
Kevin Flaherty
Description:
DUPLEX CASITA1X1 T20-M0044

Permit Reviews

Permit Number - T22CM07650
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
Start Date Submittal Complete Date Status  
10/05/2022 OTHER 10/05/2022 ACTIVE Review Details
11/30/2022 RESIDENTIAL NEW DWELLING v.2 12/01/2022 APPROVED Review Details
11/01/2022 RESIDENTIAL NEW DWELLING v.1 11/22/2022 REQUIRES RESUBMIT Review Details
05/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/09/2024 APPROVED Review Details

Conditions

Permit Number - T22CM07650
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
Date Description Comments
10/05/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/05/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM07650
Permite Description: DUPLEX CASITA1X1 T20-M0044
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/26/2023 COT - RSBU - Interior Shear Bracing N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: T22CM07650
Permit Description: DUPLEX CASITA1X1 T20-M0044
Total Completed Inspections - 18
Date Description Inspector Results Comments
01/04/2023 COT - RSPL - Sewer Passed
01/12/2023 COT - RSPL - Rough Soil Passed
01/25/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
01/25/2023 COT - RSEL - Grounding/Bonding Passed Pre-slab.
03/29/2023 COT - RSBU - Preslab Passed
03/30/2023 COT - RSEL - Electrical Underground Passed
06/20/2023 COT - RSPL - Yard Water Line Passed 6/20/23: ok to back-fill BLDG #11,12
07/26/2023 COT - RSBU - Roof Nailing Passed 7/26/23: building 11/12.
07/26/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 7/26/23: building 11/12.
08/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/30/2023 COT - RSBU - Interior Shear Bracing Passed
10/12/2023 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
10/12/2023 COT - RSEL - Temporary Service Passed 9125 E Catalina Hy, Build 11 TEP ECO
9125 E Catalina Hy, Build 12 TEP ECO
04/11/2024 COT - RSEL - Electrical Final Passed
04/11/2024 COT - RSME - Mechanical Final Passed
04/11/2024 COT - RSPL - Plumbing Final Passed
04/11/2024 RSBU - Building Final Passed
04/11/2024 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
138190 PT UNIT 11 AND 12 COMPLETE-2024-05-06_V1.PDF DOCUMENTS VIEW
TRUSS CALCS CASITAS 1X1_V1.PDF DOCUMENTS VIEW
TRUSS LAYOUT CASITAS 1X1_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW