Permit: T22CM07623
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
5942 S DEL MORAL BL
Address NEW:
5942 S DEL MORAL BL
Apply Date:
10/04/2022
Applicant:
Ramon VALDEZ
Description:
SFR VALD00122 T22-M0013
Permit Reviews
Permit Number - T22CM07623
Permit Status: Complete
Permit Description: SFR VALD00122 T22-M0013
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/04/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/18/2022 | ACTIVE |
| 11/22/2022 | RESIDENTIAL NEW DWELLING v.2 | 11/23/2022 | APPROVED |
| 11/01/2022 | RESIDENTIAL NEW DWELLING v.1 | 11/22/2022 | REQUIRES RESUBMIT |
| 12/09/2022 | RESIDENTIAL NEW DWELLING v.1 | 12/12/2022 | APPROVED |
Conditions
Permit Number - T22CM07623
Permit Status: Complete
Permit Description: SFR VALD00122 T22-M0013
| Date | Description | Comments |
|---|---|---|
| 10/04/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 10/04/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 10/04/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM07623
Permite Description: SFR VALD00122 T22-M0013
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2023 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 1-Install switch for light in closet of front bedroom. |
| 09/15/2023 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | OT0041 - 10/04/2022 - PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
| 09/15/2023 | RSBU - Building Final | N/A | Re-inspection required | 1-Post address per IRC 319.1. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM07623
Permit Description: SFR VALD00122 T22-M0013
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2023 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading is required. 4/28/2023 | |
| 04/28/2023 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading is required. 4/28/2023 | |
| 05/03/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/03/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Okay for concrete placement in footings and slab. 5/3/2023 | |
| 05/03/2023 | COT - RSBU - Preslab | Passed | Okay for concrete placement in footings and slab. 5/3/2023 | |
| 07/17/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 07/17/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 07/20/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 7/20/23: Use 5x16 nail plates for kitchen hood vent, use 4x8 nail plates at sole plate for pipe in laundry, fire block top plates at bathrooms. | |
| 07/20/2023 | COT - RSEL - Temporary Service | Passed | ||
| 08/24/2023 | BULD - Electrical Clearance | Passed | ||
| 08/25/2023 | COT - RSPL - Sewer | Passed | Approved. Under test. Rest of connection has been made. Okay to back fill shading is required. 8/25/2023 | |
| 09/15/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/15/2023 | COT - RSME - Mechanical Final | Passed | ||
| 09/18/2023 | COT - RSEL - Electrical Final | Passed | 9/18/23: Light switch has been installed in closet of front bedroom. | |
| 09/18/2023 | COT - RSPL - Plumbing Final | Passed | 9/18/23: Pima County Wastewater permit is in file. | |
| 09/18/2023 | RSBU - Building Final | Passed | 9/18/23: Address is posted on residence and on mail box out front. |