Permit: T22CM07589
Permit Details
Status:
In Review
Type:
Residential Building - One or Two Family
Address:
3340 S MAGDA AV
Address NEW:
3340 S MAGDA AV
Apply Date:
10/04/2022
Applicant:
Josefina Sablan
Description:
R - Installation of 8.10KW PV System/MPU 200A
Permit Reviews
Permit Number - T22CM07589
Permit Status: In review
Permit Description: R - Installation of 8.10KW PV System/MPU 200A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/04/2022 | OTHER | 10/10/2022 | COMPLETED |
| 12/20/2022 | RESIDENTIAL SOLAR v.1 | 01/17/2023 | APPROVED |
| 01/17/2023 | RESIDENTIAL SOLAR v.1 | 01/17/2023 | APPROVED |
Conditions
Permit Number - T22CM07589
Permit Status: In review
Permit Description: R - Installation of 8.10KW PV System/MPU 200A
| Date | Description | Comments |
|---|---|---|
| 10/07/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 10/04/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Completed Inspections
Permit Status: In Review
Permit Number: T22CM07589
Permit Description: R - Installation of 8.10KW PV System/MPU 200A
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2023 | COT - RSEL - Service Upgrade | Passed | Approved, INCR Clearance was called into TEP at 12:45pm (power-kill) | |
| 02/17/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
| 02/17/2023 | COT - RSEL - Electrical Final | Passed | ||
| 02/17/2023 | RSBU - Building Final | Passed | solar |