Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
10/03/2022
Applicant:
Kevin Flaherty
Description:
DUPLEX CASITA1X1 T20-M0044

Permit Reviews

Permit Number - T22CM07555
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
Start Date Submittal Complete Date Status  
10/03/2022 OTHER 10/03/2022 ACTIVE Review Details
11/30/2022 RESIDENTIAL NEW DWELLING v.2 12/01/2022 APPROVED Review Details
10/28/2022 RESIDENTIAL NEW DWELLING v.1 11/22/2022 REQUIRES RESUBMIT Review Details
01/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/12/2024 APPROVED Review Details
12/19/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/26/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T22CM07555
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
Date Description Comments
10/03/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/03/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/03/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM07555
Permite Description: DUPLEX CASITA1X1 T20-M0044
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/03/2024 BULD - Electrical Clearance N/A Not Applicable power is on.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM07555
Permit Description: DUPLEX CASITA1X1 T20-M0044
Total Completed Inspections - 19
Date Description Inspector Results Comments
12/15/2022 COT - RSPL - Sewer Passed
12/15/2022 COT - RSPL - Rough Soil Passed
01/06/2023 COT - RSBU - Preslab Passed
01/06/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
01/06/2023 COT - RSEL - Electrical Underground Passed
06/20/2023 COT - RSPL - Yard Water Line Passed 6/20/23: ok to back-fill
07/17/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/17/2023 COT - RSBU - Roof Nailing Passed
08/08/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/17/2023 COT - RSBU - Interior Shear Bracing Passed
10/11/2023 COT - RSEL - Grounding/Bonding Passed
10/11/2023 COT - RSEL - Temporary Service Passed Building 66,67
TEP ECO
11/30/23 clearance rent
12/11/23 clearance resent for unit #67
01/03/2024 COT - RSME - Mechanical Final Passed
01/03/2024 COT - RSEL - Outdoor Lighting Passed
01/03/2024 COT - RSPL - Plumbing Final Passed
01/03/2024 COT - RSEL - Electrical Final Passed
01/08/2024 ENGR Engineering Final Passed
01/11/2024 BULD - Electrical Clearance Passed
01/23/2024 RSBU - Building Final Passed 1/23/24: passed by previous inspector

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
CATALINA CASITAS PT SIC BLDGS 66-67-2023-12-19_V1.PDF DOCUMENTS VIEW
CONS-CASITA 1X1 DUPLEX PLAN SET_V1.PDF DOCUMENTS VIEW
TRUSS CALCS CASITAS 1X1_V1.PDF DOCUMENTS VIEW
TRUSS LAYOUT CASITAS 1X1_V1.PDF DOCUMENTS VIEW
PT UNIT 66 AND 67 COMPLETE-2024-01-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW