Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
09/30/2022
Applicant:
Description:
SFR MER1301460 T21-M0072

Conditions

Permit Number - T22CM07528
Permit Status: Issued
Permit Description: SFR MER1301460 T21-M0072
Date Description Comments
09/30/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
09/30/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
09/30/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/30/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-095/P22WP00021 IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM07528
Permite Description: SFR MER1301460 T21-M0072
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
10/26/2022 COT - RSPL - Sewer N/A Not Ready
10/26/2022 COT - RSPL - Rough Soil N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM07528
Permit Description: SFR MER1301460 T21-M0072
Total Completed Inspections - 17
Date Description Inspector Results Comments
11/28/2022 COT - RSBU - Roof Nailing Passed
11/28/2022 COT - RSBU - Exterior Clips/Sheathing Passed
01/23/2023 BULD - Electrical Clearance Passed TEP ECO
01/23/2023 COT - RSEL - Construction Power Passed
01/23/2023 COT - RSPL - Gas Pressure Test Passed
01/23/2023 RSME - Mechanical Progress Passed
01/23/2023 COT - LCPL - Plumbing Intermediate Passed
01/23/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/07/2023 COT - HCBU - Interior Shear Bracing Passed
03/22/2023 COT - LCBU - Framing Passed
04/04/2023 COT - BULD - SWG Clearance Passed SWG clearance required
04/04/2023 COT - RSPL - Plumbing Final Passed SWG clearance required
04/19/2023 ENGR Engineering Final Passed
04/19/2023 COT - RSEL - Outdoor Lighting Passed
04/19/2023 COT - RSME - Mechanical Final Passed
04/19/2023 RSBU - Building Final Passed
04/19/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW