Permit: T22CM07514
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4734 E SENECA ST
Address NEW:
4734 E SENECA ST
Apply Date:
09/30/2022
Applicant:
Andree O'Brien
Description:
R - Installation of a roof mounted 11.200kW PV System and a main panel upgrade to 200A
Permit Reviews
Permit Number - T22CM07514
Permit Status: Complete
Permit Description: R - Installation of a roof mounted 11.200kW PV System and a main panel upgrade to 200A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/30/2022 | OTHER | 10/07/2022 | ACTIVE |
| 03/23/2023 | RESIDENTIAL SOLAR v.2 | 04/06/2023 | APPROVED |
| 11/16/2022 | RESIDENTIAL SOLAR v.1 | 11/30/2022 | REQUIRES RESUBMIT |
| 05/02/2023 | RESIDENTIAL SOLAR v.1 | 05/22/2023 | APPROVED |
Conditions
Permit Number - T22CM07514
Permit Status: Complete
Permit Description: R - Installation of a roof mounted 11.200kW PV System and a main panel upgrade to 200A
| Date | Description | Comments |
|---|---|---|
| 10/07/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 09/30/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM07514
Permite Description: R - Installation of a roof mounted 11.200kW PV System and a main panel upgrade to 200A
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2023 | COT - RSEL - Electrical Final | N/A | Canceled | 6/6/23- CA, not ready 6/12/23 not ready 6/26 no response from tech |
| 06/26/2023 | RSBU - Building Final | N/A | Canceled | 6/6/23- CA, not ready 6/12/23 not ready 6/26 no response from tech |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM07514
Permit Description: R - Installation of a roof mounted 11.200kW PV System and a main panel upgrade to 200A
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/05/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
| 07/05/2023 | COT - RSEL - Electrical Final | Passed | ||
| 07/05/2023 | RSBU - Building Final | Passed |