Permit: T22CM07505
Permit Details
Apply Date:
09/30/2022
Applicant:
Samuel Lamphere
Description:
R - Installation of 12.775kw solar pv system and derate from 200a to 175a.
Permit Reviews
Permit Number - T22CM07505
Permit Status: Issued
Permit Description: R - Installation of 12.775kw solar pv system and derate from 200a to 175a.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/30/2022 | OTHER | 10/05/2022 | COMPLETED |
Conditions
Permit Number - T22CM07505
Permit Status: Issued
Permit Description: R - Installation of 12.775kw solar pv system and derate from 200a to 175a.
Date | Description | Comments |
---|---|---|
10/05/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
09/30/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM07505
Permit Description: R - Installation of 12.775kw solar pv system and derate from 200a to 175a.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/15/2022 | COT - RSEL - Electrical Final | Passed | Approved, DGC clearance to TEP is required | |
12/15/2022 | RSBU - Building Final | Passed | Solar | |
12/15/2022 | BULD - Electrical Clearance | Passed | Approved, DGC clearance to TEP is required |