Permit Reviews

Permit Number - T22CM07496
Permit Status: Complete
Permit Description: New pre-engineered metal building to provide additional service bays
Start Date Submittal Complete Date Status  
09/29/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 10/20/2022 ACTIVE Review Details
01/06/2023 COMMERCIAL REVIEW - FULL v.4 01/09/2023 APPROVED Review Details
10/28/2022 COMMERCIAL REVIEW - FULL v.1 11/17/2022 REQUIRES RESUBMIT Review Details
01/06/2023 COMMERCIAL REVIEW - FULL v.3 01/06/2023 REQUIRES RESUBMIT Review Details
11/30/2022 COMMERCIAL REVIEW - FULL v.2 12/15/2022 REQUIRES RESUBMIT Review Details
12/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/11/2024 REQUIRES RESUBMIT Review Details
12/20/2023 RESTAMP - COMMERCIAL v.1 12/21/2023 APPROVED Review Details
02/05/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/06/2025 APPROVED Review Details
01/14/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/14/2025 APPROVED Review Details
03/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 03/18/2024 REQUIRES RESUBMIT Review Details
03/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.3 03/20/2024 APPROVED Review Details
03/04/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/08/2024 REQUIRES RESUBMIT Review Details
05/22/2023 COMMERCIAL REVIEW - FULL v.1 06/18/2023 APPROVED Review Details
01/15/2025 COMMERCIAL REVIEW - FULL v.1 01/16/2025 APPROVED Review Details

Conditions

Permit Number - T22CM07496
Permit Status: Complete
Permit Description: New pre-engineered metal building to provide additional service bays
Date Description Comments
12/20/2023 Please contact Pima County Addressing to ADD BLDG #2. Addressing@pima.gov or 520-724-9512
11/16/2022 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
09/29/2022 GENERAL CONTRACTOR LETTER (GCL) REQUIRED PRIOR TO ISSUANCE
12/15/2022 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/19/2024
12/15/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/20/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
03/20/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
12/15/2022 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
03/20/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
12/15/2022 Pre-Engineered Metal Building Designs must be submitted and approved prior to ...
03/20/2024 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
03/20/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
11/16/2022 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM07496
Permite Description: New pre-engineered metal building to provide additional service bays
Total Outstanding Inspections - 12
Last Inspection Date Description Inspector Results Comments
09/06/2023 COT - HCPL - Plumbing Progress N/A Not Ready
02/23/2024 BULD - Electrical Clearance N/A Re-inspection required Provide correct address tag at meter. 2/23/2024
06/27/2024 COT - HCME - Mechanical Above Ceiling N/A Not Applicable
06/27/2024 COT - HCPL - Medical Gas/Test N/A Not Applicable
06/27/2024 COT - HCBU - Interior Shear Bracing N/A Not Applicable
06/27/2024 COT - HCME - Mechanical Progress N/A Not Applicable
06/27/2024 COT - HCPL - Medical Gas/Final N/A Not Applicable
06/27/2024 COT - HCBU - Building Progress N/A Not Applicable
09/14/2023 COT - HCBU - Framing N/A Partial Pass 9/13/23: bathroom framing per plan
06/27/2024 COT - BULD - SWG Clearance N/A Not Applicable
11/09/2023 COT - HCEL - Electrical Underground N/A Partial Pass Stubbed up to equipment. Then 160’ of 4 4” conduits secondaries stopped about 15’ from new transformer. 11/9/2023
12/08/2023 COT - HCEL - Electrical Progress N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM07496
Permit Description: New pre-engineered metal building to provide additional service bays
Total Completed Inspections - 28
Date Description Inspector Results Comments
04/10/2023 COT - HCPL - Rough Soil Passed
09/01/2023 COT - HCEL - Electrical Intermediate Passed
09/07/2023 COT - HCPL - Plumbing Intermediate Passed
09/07/2023 COT - HCPL - Plumbing Progress Passed
09/14/2023 COT - LCPL - Sewer Passed 9/13/23: sewer connections from building and grease trap ok to backfill
10/20/2023 COT - HCPL - Gas Pressure Test Passed
02/27/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO building #2. 2/27/2024
03/19/2024 ENGR Engineering Final Passed Ron with Concord
06/24/2024 COT - FCON - Fire - Final Passed
06/25/2024 COT - HCBU - Building Final Passed
06/27/2024 COT - HCEL - Outdoor Lighting Passed
06/27/2024 COT - HCBU - Roof Nailing Passed
06/27/2024 COT - HCBU - Excavation/Rebar/Zoning Passed
06/27/2024 COT - HCEL - Electrical Final Passed
06/27/2024 COT - HCBU - Exterior Clips/Sheathing Passed
06/27/2024 COT - HCME - Mechanical Final Passed
06/27/2024 COT - HCBU - Preslab Passed
06/27/2024 COT - HCME - Mechanical Intermediate Passed
06/27/2024 COT - HCEL - Grounding/Bonding Passed
06/27/2024 COT - HCBU - Framing Passed
06/27/2024 COT - HCEL - Electrical Underground Passed
06/27/2024 COT - HCEL - Electrical Progress Passed
10/28/2024 COT - FCON - Alarm - Final Passed
10/28/2024 COT - FCON - Sprinkler - Final Passed
06/27/2024 COT - HCPL - Plumbing Final Passed
06/27/2024 COT - HCPL - Gas Final Passed
06/27/2024 COT - LCBU - Building Final Passed
11/22/2024 COT - HCBU - TCO Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
SPECIAL INSPECTION - METAL BUILDING-2025-02-04_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
OUTDOOR LIGHTING CERTIFICATE_V1.PDF DOCUMENTS VIEW
122048 HOLMES TUTTLE SERVICE BAYS FOUNDATION DESIGN - SSI MEMO SERVICE BUILDING-2025-01-14_V2.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
HTF SERVICE - SPECIAL INSPECTION LTR-2024-03-19_V2.PDF DOCUMENTS VIEW
HTF SERVICE - TAB REPORT_V1.PDF DOCUMENTS VIEW
HTF SERVICE - SPECIAL INSPECTION LTR-2024-03-19_V2.PDF DOCUMENTS VIEW
HTF SERVICE - TAB REPORT_V1.PDF DOCUMENTS VIEW
HOLMES TUTTLE FORD SERVICE BAY (CHLORINATION) REPORT-2024-03-06_V1.PDF DOCUMENTS VIEW
STAMPED METAL BUILDING SHOP DRAWINGS_V1.PDF DOCUMENTS VIEW
CONS-09.12.23_HOLMES TUTTLE FORD_DELTA 2_NEW ADDRESS (1)_V1.PDF DOCUMENTS VIEW
NARRATIVE FOR T22CM07496 - UPLOADED ATTACHMENT_V1.PDF DOCUMENTS VIEW
CONS-REV1_1 PLAN SET_V1.PDF DOCUMENTS VIEW
REV1_NARRATIVE_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1_V1.PDF DOCUMENTS VIEW
1_DEFERRED SUBMITTAL_V1.PDF DOCUMENTS VIEW
1_SOILS REPORT_V1.PDF DOCUMENTS VIEW
2_COMCHECK - LIGHTING_V1.PDF DOCUMENTS VIEW
2_PLAN SET_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW
T22CM07496_CONTRACTOR LETTER OF INTENT_V1.PDF DOCUMENTS VIEW
T22CM07496_COT RESPONSE LETTER 11.18.22_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW