Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
09/28/2022
Applicant:
Shawna Zimbelman
Description:
SFR LE23001 T22-M0058

Outstanding Activity Conditions

Permit Number - T22CM07472
Permit Status: Issued
Permit Description: SFR LE23001 T22-M0058
Total Outstanding Activity Conditions - 5
Date Name
07/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/13/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/28/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
09/28/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/28/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-098/P22WP00026, THE PUBLIC OFFSITE SEWER G-2020-058/P21WP00065 FOR PARCEL 3, THE PUBLICOFFSITE SEWER G-20-20-101/P21WP00064 FOR PARCEL 4, AND THE PUBLIC SEWER G-2020-090/P21WP00062 FOR PARCEL 5, IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM07472
Permite Description: SFR LE23001 T22-M0058
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
02/28/2023 COT - RSPL - Sewer N/A Re-inspection required
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM07472
Permit Description: SFR LE23001 T22-M0058
Total Completed Inspections - 24
Date Description Inspector Results Comments
11/16/2022 COT - RSPL - Yard Water Line Passed
11/16/2022 COT - RSPL - Rough Soil Passed okay to backfill. shading required.
11/22/2022 COT - RSEL - Grounding/Bonding Passed
11/22/2022 COT - RSBU - Excavation/Rebar/Zoning Passed
11/22/2022 COT - RSEL - Electrical Underground Passed
11/22/2022 COT - RSBU - Preslab Passed
12/15/2022 COT - RSBU - Exterior Clips/Sheathing Passed
02/17/2023 COT - RSEL - Construction Power Passed TEP ECO
03/20/2023 COT - LCBU - Framing Passed
03/20/2023 COT - RSPL - Gas Pressure Test Passed
03/20/2023 COT - LCPL - Plumbing Intermediate Passed
03/20/2023 RSME - Mechanical Progress Passed
03/20/2023 COT - RSBU - Roof Nailing Passed
03/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/03/2023 COT - RSBU - Interior Shear Bracing Passed Sheet rock on ceiling of garage has been corrected and is running perpendicular to rafters.
04/11/2023 COT - RSPL - Sewer Passed Sewer passed
06/20/2023 COT - BULD - SWG Clearance Passed 6/20/23: SWG clearance, meter only.
06/20/2023 COT - HCBU - Interior Shear Bracing Passed
06/23/2023 COT - RSPL - Plumbing Final Passed
06/23/2023 COT - RSEL - Electrical Final Passed
06/23/2023 COT - RSME - Mechanical Final Passed
06/23/2023 COT - RSEL - Outdoor Lighting Passed
06/23/2023 ENGR Engineering Final Passed
06/23/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW