Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
09/28/2022
Applicant:
Christopher Sedano
Description:
SFR F50B22 T22-M0032

Permit Reviews

Permit Number - T22CM07463
Permit Status: Complete
Permit Description: SFR F50B22 T22-M0032
Start Date Submittal Complete Date Status  
11/03/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/09/2023 REQUIRES RESUBMIT Review Details
09/26/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/27/2023 APPROVED Review Details
12/11/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/11/2023 APPROVED Review Details

Conditions

Permit Number - T22CM07463
Permit Status: Complete
Permit Description: SFR F50B22 T22-M0032
Date Description Comments
09/28/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
09/28/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/12/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE
09/26/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/26/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/26/2023 Post-Tension Inspection Report is required.
09/26/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/26/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM07463
Permite Description: SFR F50B22 T22-M0032
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
10/26/2022 COT - RSPL - Sewer N/A Not Ready
10/26/2022 COT - RSPL - Rough Soil N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM07463
Permit Description: SFR F50B22 T22-M0032
Total Completed Inspections - 21
Date Description Inspector Results Comments
11/04/2022 COT - RSEL - Grounding/Bonding Passed
11/04/2022 COT - RSBU - Preslab Passed
11/04/2022 COT - RSEL - Electrical Underground Passed
11/04/2022 COT - RSBU - Excavation/Rebar/Zoning Passed
01/31/2023 COT - RSBU - Roof Nailing Passed
02/07/2023 COT - RSBU - Exterior Clips/Sheathing Passed
05/23/2023 COT - LCPL - Plumbing Intermediate Passed
05/23/2023 COT - RSPL - Gas Pressure Test Passed
05/23/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/23/2023 COT - LCBU - Framing Passed
05/23/2023 RSME - Mechanical Progress Passed
06/05/2023 COT - RSEL - Construction Power Passed
06/09/2023 COT - HCBU - Interior Shear Bracing Passed
06/09/2023 COT - RSBU - Interior Shear Bracing Passed 6/9/23: Already passed on 6/9/23.
08/30/2023 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/30/2023
09/25/2023 ENGR Engineering Final Passed
09/25/2023 COT - RSEL - Electrical Final Passed
09/25/2023 RSBU - Building Final Passed
09/25/2023 COT - RSEL - Outdoor Lighting Passed
09/26/2023 COT - RSPL - Plumbing Final Passed
09/26/2023 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
2_ MANUFACTURER DELIVERY TRUSS PACKAGE_V2.PDF DOCUMENTS VIEW
CONS-152455 - SAGUARO TRAILS LOT 3343 - PT REPORT_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW