Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - T22CM07420
Permit Status: Issued
Permit Description: SFR LENNLE4002 T22-M0046
Date | Description | Comments |
---|---|---|
09/27/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
09/27/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/27/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
09/27/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-90/P21WP00062 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM07420
Permite Description: SFR LENNLE4002 T22-M0046
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
10/26/2022 | COT - RSBU - Preslab | N/A | Not Ready | |
10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
05/17/2023 | RSME - Mechanical Progress | N/A | Re-inspection required | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM07420
Permit Description: SFR LENNLE4002 T22-M0046
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/12/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} | |
10/12/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved. Shading required.} | |
11/14/2022 | COT - RSBU - Roof Nailing | Passed | ||
11/16/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | corrections were made. | |
03/20/2023 | COT - RSEL - Construction Power | Passed | Clearance for TEP ECO. 3/29/2023 | |
03/20/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 3/29/2023 | |
04/10/2023 | COT - RSPL - Sewer | Passed | ||
04/20/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
04/20/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
04/20/2023 | COT - LCBU - Framing | Passed | ||
04/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/27/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
07/18/2023 | COT - BULD - SWG Clearance | Passed | 7/18/23: swg clearance for meter only. | |
07/26/2023 | COT - RSPL - Plumbing Final | Passed | ||
07/26/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
07/26/2023 | ENGR Engineering Final | Passed | ||
07/26/2023 | COT - RSEL - Electrical Final | Passed | ||
07/26/2023 | COT - RSME - Mechanical Final | Passed | ||
07/26/2023 | RSBU - Building Final | Passed | Missing anti-tip for stove. |