Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM07410
Permit Details
Apply Date:
09/27/2022
Applicant:
Michael Mcnamara
Description:
Standby Generator
Permit Reviews
Permit Number - T22CM07410
Permit Status: Issued
Permit Description: Standby Generator
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/27/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/12/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM07410
Permit Status: Issued
Permit Description: Standby Generator
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/27/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM07410
Permite Description: Standby Generator
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2022 | BULD - Electrical Clearance | N/A | Re-inspection required | Denied, panel above gas meter shall be moved, recommended to consult with TEP for location |
12/19/2022 | COT - LCEL - Electrical Final | N/A | Re-inspection required | Denied, panel above gas meter shall be moved |
12/19/2022 | COT - LCEL - Electrical Underground | N/A | Re-inspection required | Underground line from panel to generator shall be separated from gas |
12/19/2022 | COT - BULD - SWG Clearance | N/A | Partial Pass | Partial gas line and pressure test, pending recommendation from TEP / SWG for location panel location above meter |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM07410
Permit Description: Standby Generator
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
12/19/2022 | COT - LCPL - Gas Pressure Test | Passed | Approved pressure test, electrical line must be moved prior to shading of trench |