Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
09/26/2022
Applicant:
Denise Dunning
Description:
SFR F60C22 T22-M0020

Permit Reviews

Permit Number - T22CM07376
Permit Status: Issued
Permit Description: SFR F60C22 T22-M0020
Start Date Submittal Complete Date Status  
09/26/2022 OTHER 09/27/2022 COMPLETED Review Details

Conditions

Permit Number - T22CM07376
Permit Status: Issued
Permit Description: SFR F60C22 T22-M0020
Date Description Comments
09/26/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
09/26/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
09/26/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM07376
Permite Description: SFR F60C22 T22-M0020
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/28/2022 COT - RSBU - Preslab N/A Re-inspection required DE
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
10/26/2022 COT - RSPL - Sewer N/A Not Ready
10/26/2022 COT - RSPL - Rough Soil N/A Not Ready
10/28/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required DE Box & wrap all exposed soil pipe
02/22/2023 COT - LCPL - Plumbing Intermediate N/A Not Ready per previous notes
02/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready per previous notes

Completed Inspections

Permit Status: Issued
Permit Number: T22CM07376
Permit Description: SFR F60C22 T22-M0020
Total Completed Inspections - 19
Date Description Inspector Results Comments
11/04/2022 COT - RSBU - Excavation/Rebar/Zoning Passed
01/31/2023 COT - RSBU - Roof Nailing Passed
02/01/2023 COT - RSBU - Exterior Clips/Sheathing Passed
02/17/2023 COT - RSPL - Gas Pressure Test Passed
02/17/2023 RSME - Mechanical Progress Passed
02/17/2023 COT - LCBU - Framing Passed
02/23/2023 BULD - Electrical Clearance Passed TEP ECO
02/23/2023 COT - RSEL - Construction Power Passed
02/23/2023 COT - LCPL - Plumbing Intermediate Passed
02/23/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/10/2023 COT - HCBU - Interior Shear Bracing Passed
05/22/2023 COT - BULD - SWG Clearance Passed 5/22/23- SWG CLEARANCE for meter
05/26/2023 COT - RSME - Mechanical Final Passed
05/26/2023 RSBU - Building Final Passed
05/26/2023 COT - RSEL - Outdoor Lighting Passed
05/26/2023 COT - RSEL - Electrical Final Passed
05/26/2023 ENGR Engineering Final Passed
05/26/2023 COT - RSPL - Plumbing Final Passed
05/26/2023 COT - FCON - Sprinkler - Final Passed Approved on 5/23/23 on permit# TF-FCP-0123-00275

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW