Permit: T22CM07367
Permit Details
Apply Date:
09/26/2022
Applicant:
Collin McClintock
Description:
R - Installation of residential rooftop solar PV with a system size of 9.99 kW DC with a main panel
Permit Reviews
Permit Number - T22CM07367
Permit Status: In review
Permit Description: R - Installation of residential rooftop solar PV with a system size of 9.99 kW DC with a main panel
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/26/2022 | OTHER | 10/03/2022 | COMPLETED |
11/23/2022 | RESIDENTIAL SOLAR v.1 | 11/23/2022 | REQUIRES RESUBMIT |
02/13/2023 | RESIDENTIAL SOLAR v.2 | N/A | IN REVIEW |
Conditions
Permit Number - T22CM07367
Permit Status: In review
Permit Description: R - Installation of residential rooftop solar PV with a system size of 9.99 kW DC with a main panel
Date | Description | Comments |
---|---|---|
09/30/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
09/26/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: In Review
Permit Number: T22CM07367
Permite Description: R - Installation of residential rooftop solar PV with a system size of 9.99 kW DC with a main panel
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/12/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
04/12/2023 | RSEL - Electrical Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: In Review
Permit Number: T22CM07367
Permit Description: R - Installation of residential rooftop solar PV with a system size of 9.99 kW DC with a main panel
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2023 | COT - RSEL - Service Upgrade | Passed | Incr clearance called into TEP at 12:55 | |
04/12/2023 | BULD - Electrical Clearance | Passed | Approved, DGC clearance to TEP is required for the solar meter | |
04/12/2023 | COT - RSEL - Electrical Final | Passed | ||
04/12/2023 | RSBU - Building Final | Passed | duplicate |