Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM07343
Permit Details
Apply Date:
09/23/2022
Applicant:
Mark Alteri
Description:
SFR PVCS1041 T22-M0050
Permit Reviews
Permit Number - T22CM07343
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/23/2022 | OTHER | 09/23/2022 | ACTIVE |
06/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/23/2023 | APPROVED |
11/30/2022 | RESIDENTIAL NEW DWELLING v.1 | 12/08/2022 | APPROVED |
03/20/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/21/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM07343
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Date | Description | Comments |
---|---|---|
09/23/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/23/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM07343
Permit Description: SFR PVCS1041 T22-M0050
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/20/2023 | COT - RSPL - Yard Water Line | Passed | Water line is connected to main supply line and operational. | |
03/20/2023 | COT - RSPL - Sewer | Passed | 3-20-23: Sewer lines is connected to main sewer line with proper clean outs and back water valve. Okay to backfill trenches. | |
03/20/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is under water test and all joints are good. Okay to backfill and compact for concrete slab. | |
03/23/2023 | COT - RSEL - Electrical Underground | Passed | ||
03/23/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Sean Hille 520-904-0101 Sean Hille 520-904-0101 Sean Hille 520-904-0101 520-904-0101 |
|
03/23/2023 | COT - RSBU - Preslab | Passed | ||
03/23/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
04/07/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior sheathing is properly nailed off. All joist have H2.5 clips attached to joists and top plate. | |
04/25/2023 | COT - RSBU - Roof Nailing | Passed | ||
05/04/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. All MEP's looked at. Okay to proceed. 5/4/2023 | |
05/04/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
05/19/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/14/2023 | ENGR Engineering Final | Passed | ||
08/14/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
08/18/2023 | COT - RSEL - Electrical Final | Passed | ||
08/18/2023 | COT - RSME - Mechanical Final | Passed | ||
08/18/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/18/2023 | RSBU - Building Final | Passed | ||
08/18/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/18/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance issued |