Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
09/23/2022
Applicant:
Mark Alteri
Description:
SFR PVCS1041 T22-M0050

Permit Reviews

Permit Number - T22CM07343
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Start Date Submittal Complete Date Status  
09/23/2022 OTHER 09/23/2022 ACTIVE Review Details
06/16/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/23/2023 APPROVED Review Details
11/30/2022 RESIDENTIAL NEW DWELLING v.1 12/08/2022 APPROVED Review Details
03/20/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/21/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T22CM07343
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Date Description Comments
09/23/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/23/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM07343
Permit Description: SFR PVCS1041 T22-M0050
Total Completed Inspections - 20
Date Description Inspector Results Comments
03/20/2023 COT - RSPL - Yard Water Line Passed Water line is connected to main supply line and operational.
03/20/2023 COT - RSPL - Sewer Passed 3-20-23: Sewer lines is connected to main sewer line with proper clean outs and back water valve. Okay to backfill trenches.
03/20/2023 COT - RSPL - Rough Soil Passed Underground plumbing is under water test and all joints are good. Okay to backfill and compact for concrete slab.
03/23/2023 COT - RSEL - Electrical Underground Passed
03/23/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Sean Hille
520-904-0101
Sean Hille
520-904-0101
Sean Hille
520-904-0101
520-904-0101
03/23/2023 COT - RSBU - Preslab Passed
03/23/2023 COT - RSEL - Grounding/Bonding Passed
04/07/2023 COT - RSBU - Exterior Clips/Sheathing Passed Exterior sheathing is properly nailed off. All joist have H2.5 clips attached to joists and top plate.
04/25/2023 COT - RSBU - Roof Nailing Passed
05/04/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Approved. All MEP's looked at. Okay to proceed. 5/4/2023
05/04/2023 COT - RSPL - Gas Pressure Test Passed
05/19/2023 COT - RSBU - Interior Shear Bracing Passed
08/14/2023 ENGR Engineering Final Passed
08/14/2023 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
08/18/2023 COT - RSEL - Electrical Final Passed
08/18/2023 COT - RSME - Mechanical Final Passed
08/18/2023 COT - RSPL - Plumbing Final Passed
08/18/2023 RSBU - Building Final Passed
08/18/2023 COT - RSEL - Outdoor Lighting Passed
08/18/2023 COT - BULD - SWG Clearance Passed SWG clearance issued

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PT REPORT LOT 21-2023-06-15_V1.PDF DOCUMENTS VIEW
APPLICATION_V1.PDF DOCUMENTS VIEW
CONS-SITE PLAN_V1.PDF DOCUMENTS VIEW
SIC-2022-11-30_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW