Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2200 E 5TH ST
Address NEW:
2200 E 5TH ST
Apply Date:
09/23/2022
Applicant:
Description:
R - roof mount 8.40 kW DC photovoltaic solar system; 21 AC modules, 3 branches, 2 PV subpanels, 40A

Permit Reviews

Permit Number - T22CM07326
Permit Status: Complete
Permit Description: R - roof mount 8.40 kW DC photovoltaic solar system; 21 AC modules, 3 branches, 2 PV subpanels, 40A
Start Date Submittal Complete Date Status  
09/23/2022 OTHER 09/27/2022 COMPLETED Review Details

Conditions

Permit Number - T22CM07326
Permit Status: Complete
Permit Description: R - roof mount 8.40 kW DC photovoltaic solar system; 21 AC modules, 3 branches, 2 PV subpanels, 40A
Date Description Comments
09/27/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
09/23/2022 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM07326
Permite Description: R - roof mount 8.40 kW DC photovoltaic solar system; 21 AC modules, 3 branches, 2 PV subpanels, 40A
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/15/2022 COT - RSEL - Electrical Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM07326
Permit Description: R - roof mount 8.40 kW DC photovoltaic solar system; 21 AC modules, 3 branches, 2 PV subpanels, 40A
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/15/2022 COT - RSEL - Electrical Underground Passed Approved, okay to backfill and concrete placement
11/16/2022 RSBU - Building Final Passed Solar
11/16/2022 COT - RSEL - Electrical Final Passed Approved, DGC to TEP is required

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLANS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SPECS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLANS.PDF DOCUMENTS VIEW
SPECS.PDF DOCUMENTS VIEW