Permit: T22CM07209
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
4594 E BROADWAY BL
Address NEW:
4594 E BROADWAY BL
Apply Date:
09/20/2022
Applicant:
Dawn Berger
Description:
TI: TEA SHOP
Permit Reviews
Permit Number - T22CM07209
Permit Status: Complete
Permit Description: TI: TEA SHOP
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/20/2022 | 3RD PARTY REVIEW - COMMERCIAL TI | 10/18/2022 | ACTIVE |
| 06/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/01/2023 | REQUIRES RESUBMIT |
| 05/08/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/09/2023 | APPROVED |
| 10/28/2022 | COMMERCIAL REVIEW - FULL v.1 | 12/19/2022 | REQUIRES RESUBMIT |
| 01/12/2023 | COMMERCIAL REVIEW - FULL v.2 | 02/06/2023 | APPROVED |
| 06/02/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 06/08/2023 | APPROVED |
| 05/22/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/26/2023 | APPROVED |
Conditions
Permit Number - T22CM07209
Permit Status: Complete
Permit Description: TI: TEA SHOP
| Date | Description | Comments |
|---|---|---|
| 01/13/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 09/20/2022 | GENERAL CONTRACTOR LETTER (GCL) REQUIRED PRIOR TO ISSUANCE | |
| 01/13/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM07209
Permite Description: TI: TEA SHOP
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | Need pictures of mounted fire extinguisher |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM07209
Permit Description: TI: TEA SHOP
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2023 | COT - HCPL - Rough Soil | Passed | underground plumbing is holding water. okay to backfill. vent stack will connect to a common vent pipe in the ceiling at a later date. | |
| 03/20/2023 | COT - HCBU - Interior Shear Bracing | Passed | No interior shear bracing on this project. | |
| 03/20/2023 | COT - HCEL - Electrical Intermediate | Passed | Electrical rough in complete. Okay to sheet rock walls. | |
| 03/20/2023 | COT - HCME - Mechanical Above Ceiling | Passed | Mechanical rough in is complete above ceiling. Okay to install ceiling tiles in grid ceiling. | |
| 03/20/2023 | COT - HCME - Mechanical Intermediate | Passed | Mechanical rough in complete. | |
| 03/20/2023 | COT - HCPL - Plumbing Above Ceiling | Passed | Plumbing rough in is complete above ceiling. | |
| 03/20/2023 | COT - HCPL - Plumbing Intermediate | Passed | Plumbing rough in is complete. Okay to sheet rock walls. | |
| 03/20/2023 | COT - HCBU - Framing | Passed | Rough framing is complete. Okay to install sheet rock on studs. | |
| 05/18/2023 | SITE - Zoning Final | Passed | ||
| 05/19/2023 | COT - FCON - Sprinkler - Final | Passed | ||
| 05/19/2023 | COT - HCBU - Building Final | Passed | 5-19-22: Apply for C of O. | |
| 05/19/2023 | COT - HCEL - Electrical Final | Passed | ||
| 05/19/2023 | COT - HCME - Mechanical Final | Passed | ||
| 05/19/2023 | COT - HCPL - Plumbing Final | Passed | ||
| 05/19/2023 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 06/07/2023 | COT - FCON - Fire - Final | Passed |