Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
09/16/2022
Applicant:
Helen Ormsby
Description:
SFR DRHOH35G21 T21-M0042

Permit Reviews

Permit Number - T22CM07131
Permit Status: Issued
Permit Description: SFR DRHOH35G21 T21-M0042
Start Date Submittal Complete Date Status  
06/02/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/02/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM07131
Permit Status: Issued
Permit Description: SFR DRHOH35G21 T21-M0042
Total Outstanding Activity Conditions - 2
Date Name
09/16/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
09/16/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2018-112(P21WP00113) IS ACCEPTED ANDRELEASED BY PCRWRD

Conditions

Permit Number - T22CM07131
Permit Status: Issued
Permit Description: SFR DRHOH35G21 T21-M0042
Date Description Comments
09/16/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM07131
Permite Description: SFR DRHOH35G21 T21-M0042
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final N/A Not Ready
10/27/2022 RSME - Mechanical Progress N/A Not Ready
03/16/2023 COT - LCBU - Framing N/A Partial Pass Partial per intermediates.
03/16/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Partial Pass Partial pass. Need an engineer approval on a STHD hold down in back door that was not in proper place to be nailed to studs. 3/16/2023

Completed Inspections

Permit Status: Issued
Permit Number: T22CM07131
Permit Description: SFR DRHOH35G21 T21-M0042
Total Completed Inspections - 20
Date Description Inspector Results Comments
02/22/2023 COT - RSPL - Yard Water Line Passed waterlines are connected to meter. Okay to backfill trenches.
02/22/2023 COT - RSPL - Rough Soil Passed Underground plumbing is holding water. Okay to backfill trenches.
02/22/2023 COT - RSPL - Sewer Passed
02/27/2023 COT - RSEL - Grounding/Bonding Passed
02/28/2023 COT - RSEL - Electrical Underground Passed
03/02/2023 COT - RSBU - Preslab Passed 3-2-23: Corrections completed. Per builder, j-bolts will be installed in lieu of masa straps.
03/02/2023 COT - RSBU - Excavation/Rebar/Zoning Passed 3-2-23: Corrections completed. Per builder, j-bolts will be installed in lieu of masa straps.
03/16/2023 COT - RSBU - Roof Nailing Passed
03/16/2023 COT - RSEL - Construction Power Passed Clearance for TEP ECO. 3/16/2023
04/03/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/03/2023 COT - LCPL - Plumbing Intermediate Passed
04/03/2023 COT - RSPL - Gas Pressure Test Passed
04/10/2023 BULD - Electrical Clearance Passed TEP ECO
04/14/2023 COT - HCBU - Interior Shear Bracing Passed
06/07/2023 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 6/7/2023
06/23/2023 COT - RSPL - Plumbing Final Passed
06/23/2023 COT - RSEL - Electrical Final Passed
06/23/2023 RSBU - Building Final Passed
06/23/2023 COT - RSEL - Outdoor Lighting Passed
06/23/2023 COT - RSME - Mechanical Final Passed