Permit: T22CM07120
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
9808 E ROCK RIDGE CT
Address NEW:
9808 E ROCK RIDGE CT
Apply Date:
09/16/2022
Applicant:
Gail Connor
Description:
R-Master Suite Addition
Permit Reviews
Permit Number - T22CM07120
Permit Status: Complete
Permit Description: R-Master Suite Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/16/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/14/2022 | COMPLETED |
| 07/12/2023 | RESIDENTIAL NEW DWELLING v.2 | 07/12/2023 | APPROVED |
| 09/08/2023 | RESIDENTIAL NEW DWELLING v.1 | 09/26/2023 | APPROVED |
| 11/21/2022 | RESIDENTIAL NEW DWELLING v.1 | 12/29/2022 | APPROVED |
| 08/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/20/2024 | APPROVED |
| 06/20/2023 | RESIDENTIAL NEW DWELLING v.1 | 07/12/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM07120
Permit Status: Complete
Permit Description: R-Master Suite Addition
| Date | Description | Comments |
|---|---|---|
| 12/29/2022 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 12/29/2022 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/14/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
| 12/29/2022 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 12/29/2022 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM07120
Permite Description: R-Master Suite Addition
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2023 | BULD - Electrical Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM07120
Permit Description: R-Master Suite Addition
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2023 | COT - RSBU - Preslab | Passed | Approved, okay for concrete placement | |
| 06/06/2023 | RSBU - Building Progress | Passed | ||
| 07/27/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 07/27/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 07/27/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 10/03/2023 | ENGR Engineering Final | Passed | ||
| 10/03/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/03/2023 | COT - RSEL - Electrical Final | Passed | ||
| 10/03/2023 | RSBU - Building Final | Passed | ||
| 10/03/2023 | RSEL - Electrical Progress | Passed | ||
| 10/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |