Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM07106
Permit Details
Apply Date:
09/16/2022
Applicant:
Helen Ormsby
Description:
SFR DRHOH35D21 T21-M0044: REV 1 - as-built patio wall
Permit Reviews
Permit Number - T22CM07106
Permit Status: Issued
Permit Description: SFR DRHOH35D21 T21-M0044: REV 1 - as-built patio wall
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/12/2023 | RESIDENTIAL NEW DWELLING v.1 | 01/17/2023 | APPROVED |
06/02/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/02/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM07106
Permit Status: Issued
Permit Description: SFR DRHOH35D21 T21-M0044: REV 1 - as-built patio wall
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
09/16/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
09/16/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
09/16/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2018-112(P21WP00113) IS ACCEPTED ANDRELEASED BY PCRWRD |
Conditions
Permit Number - T22CM07106
Permit Status: Issued
Permit Description: SFR DRHOH35D21 T21-M0044: REV 1 - as-built patio wall
Date | Description | Comments |
---|---|---|
09/16/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM07106
Permite Description: SFR DRHOH35D21 T21-M0044: REV 1 - as-built patio wall
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
10/27/2022 | RSME - Mechanical Progress | N/A | Not Ready | |
04/12/2023 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM07106
Permit Description: SFR DRHOH35D21 T21-M0044: REV 1 - as-built patio wall
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/10/2023 | COT - RSPL - Yard Water Line | Passed | ||
02/10/2023 | COT - RSPL - Sewer | Passed | ||
02/10/2023 | COT - RSPL - Rough Soil | Passed | ||
02/21/2023 | COT - RSBU - Preslab | Passed | ||
02/21/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
02/21/2023 | COT - RSEL - Electrical Underground | Passed | ||
03/10/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | All hold downs are properly attached. Clips for rafters are properly nailed off. | |
03/10/2023 | COT - RSBU - Roof Nailing | Passed | Roof sheeting is properly nailed off. Okay to dry in and roof when ready. | |
03/10/2023 | COT - LCBU - Framing | Passed | Framing is complete per plans. | |
03/24/2023 | COT - RSEL - Construction Power | Passed | ||
04/03/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
04/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/03/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
04/13/2023 | COT - HCBU - Interior Shear Bracing | Passed | Approved. Corrections were made 4/13/2023 | |
05/10/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 5/10/2023 | |
05/30/2023 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 5/30/2023 | |
06/12/2023 | COT - RSPL - Plumbing Final | Passed | ||
06/12/2023 | RSBU - Building Final | Passed | ||
06/12/2023 | COT - RSME - Mechanical Final | Passed | ||
06/12/2023 | COT - RSEL - Electrical Final | Passed | ||
06/12/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
11/13/2023 | ENGR Engineering Final | Passed | ground subsidence SEC of lot needs investigating. remove nursery stakes from landscaping trees (second time noted). |