Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
09/16/2022
Applicant:
Helen Ormsby
Description:
SFR DRHOH35B21 T21-M0045: REV 1 - as-built patio wall

Permit Reviews

Permit Number - T22CM07095
Permit Status: Issued
Permit Description: SFR DRHOH35B21 T21-M0045: REV 1 - as-built patio wall
Start Date Submittal Complete Date Status  
01/12/2023 RESIDENTIAL NEW DWELLING v.1 01/13/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM07095
Permit Status: Issued
Permit Description: SFR DRHOH35B21 T21-M0045: REV 1 - as-built patio wall
Total Outstanding Activity Conditions - 4
Date Name
09/16/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
09/16/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
09/16/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/16/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2018-112(P21WP00113) IS ACCEPTED ANDRELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM07095
Permite Description: SFR DRHOH35B21 T21-M0045: REV 1 - as-built patio wall
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final N/A Not Ready
10/26/2022 COT - RSEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - RSPL - Gas Pressure Test N/A Not Ready
10/27/2022 RSME - Mechanical Progress N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM07095
Permit Description: SFR DRHOH35B21 T21-M0045: REV 1 - as-built patio wall
Total Completed Inspections - 23
Date Description Inspector Results Comments
02/10/2023 COT - RSPL - Yard Water Line Passed
02/10/2023 COT - RSPL - Rough Soil Passed
02/10/2023 COT - RSPL - Sewer Passed
02/21/2023 COT - RSBU - Preslab Passed
02/21/2023 COT - RSEL - Electrical Underground Passed
02/21/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
03/24/2023 COT - RSEL - Construction Power Passed
04/05/2023 COT - RSBU - Roof Nailing Passed
04/05/2023 COT - RSBU - Exterior Clips/Sheathing Passed Corrections were made. 4/5/2023
04/05/2023 COT - LCBU - Framing Passed Corrections were made. 4/5/2023
04/25/2023 COT - RSEL - Grounding/Bonding Passed
04/25/2023 COT - RSPL - Gas Pressure Test Passed
04/25/2023 RSME - Mechanical Progress Passed
04/25/2023 COT - LCPL - Plumbing Intermediate Passed
04/25/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/10/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 5/10/2023
05/12/2023 COT - HCBU - Interior Shear Bracing Passed
07/07/2023 COT - BULD - SWG Clearance Passed SWG for meter only
07/14/2023 COT - RSPL - Plumbing Final Passed
07/14/2023 COT - RSEL - Electrical Final Passed
07/14/2023 COT - RSME - Mechanical Final Passed
07/14/2023 RSBU - Building Final Passed
07/14/2023 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW
CONS-SVB 2 REV1 PLOT PLAN_V1.PDF DOCUMENTS VIEW
SVB 2 REV1 NARRATIVE LETTER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW