Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM07058
Permit Details
Apply Date:
09/14/2022
Applicant:
Richard Willard
Description:
SFR LE23001 T22-M0058
Permit Reviews
Permit Number - T22CM07058
Permit Status: Issued
Permit Description: SFR LE23001 T22-M0058
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/28/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/28/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - T22CM07058
Permit Status: Issued
Permit Description: SFR LE23001 T22-M0058
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
07/10/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/10/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
09/14/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
09/14/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
09/14/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-098/P22WP00026, THE PUBLIC OFFSITE SEWER G-2020-058/P21WP00065 FOR PARCEL 3, THE PUBLICOFFSITE SEWER G-20-20-101/P21WP00064 FOR PARCEL 4, AND THE PUBLIC SEWER G-2020-090/P21WP00062 FOR PARCEL 5, IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM07058
Permite Description: SFR LE23001 T22-M0058
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM07058
Permit Description: SFR LE23001 T22-M0058
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/21/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} | |
09/21/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved. Shading required.} | |
10/13/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
10/13/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. } |
|
10/13/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
10/13/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready rebar needs to be attached to the STHD plate} | |
01/26/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
02/01/2023 | COT - RSBU - Roof Nailing | Passed | ||
02/01/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
03/02/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
03/02/2023 | COT - LCBU - Framing | Passed | ||
03/02/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
03/02/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
03/02/2023 | RSEL - Electrical Progress | Passed | ||
03/02/2023 | RSME - Mechanical Progress | Passed | ||
03/21/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
03/24/2023 | COT - RSPL - Sewer | Passed | pass | |
06/21/2023 | COT - BULD - SWG Clearance | Passed | ||
06/26/2023 | COT - RSPL - Plumbing Final | Passed | ||
06/26/2023 | ENGR Engineering Final | Passed | ||
06/26/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
06/26/2023 | COT - RSEL - Electrical Final | Passed | ||
06/26/2023 | RSBU - Building Final | Passed | 6/26/23: cover water heater pipes with uv rated tape, lower thermostat to be 54" OC above floor per plans. | |
06/26/2023 | COT - RSME - Mechanical Final | Passed |