Permit: T22CM07040
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
4602 E SYLVANE ST
Address NEW:
4602 E SYLVANE ST
Apply Date:
09/14/2022
Applicant:
Description:
R - Residentail Installation of a 5.330 kW, with 13 panels. Roof mounted Solar panels system. PV Arr
Permit Reviews
Permit Number - T22CM07040
Permit Status: Issued
Permit Description: R - Residentail Installation of a 5.330 kW, with 13 panels. Roof mounted Solar panels system. PV Arr
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/14/2022 | OTHER | 09/21/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM07040
Permit Status: Issued
Permit Description: R - Residentail Installation of a 5.330 kW, with 13 panels. Roof mounted Solar panels system. PV Arr
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/20/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T22CM07040
Permit Status: Issued
Permit Description: R - Residentail Installation of a 5.330 kW, with 13 panels. Roof mounted Solar panels system. PV Arr
| Date | Description | Comments |
|---|---|---|
| 09/14/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM07040
Permite Description: R - Residentail Installation of a 5.330 kW, with 13 panels. Roof mounted Solar panels system. PV Arr
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2023 | BULD - Electrical Clearance | N/A | Canceled | 5/11 - CA by Gilbert |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM07040
Permit Description: R - Residentail Installation of a 5.330 kW, with 13 panels. Roof mounted Solar panels system. PV Arr
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2023 | COT - RSEL - Service Upgrade | Passed | For service upgrade, INCR clearance was called into TEP at 12:00pm (power-kill) - Pending Solar | |
| 09/06/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
| 09/06/2023 | RSBU - Building Final | Passed | ||
| 09/06/2023 | COT - RSEL - Electrical Final | Passed |