Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
09/13/2022
Applicant:
Ladonna Martin
Description:
R - - SYSTEM SIZE: 4745W DC, 3770W AC- MODULES: (13) LONGI GREEN ENERGY TECHNOLOGY COLTD: LR4-60HP

Permit Reviews

Permit Number - T22CM07013
Permit Status: Inspections complete
Permit Description: R - - SYSTEM SIZE: 4745W DC, 3770W AC- MODULES: (13) LONGI GREEN ENERGY TECHNOLOGY COLTD: LR4-60HP
Start Date Submittal Complete Date Status  
09/13/2022 OTHER 09/21/2022 COMPLETED Review Details
06/20/2023 RESIDENTIAL SOLAR v.1 07/07/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM07013
Permit Status: Inspections complete
Permit Description: R - - SYSTEM SIZE: 4745W DC, 3770W AC- MODULES: (13) LONGI GREEN ENERGY TECHNOLOGY COLTD: LR4-60HP
Total Outstanding Activity Conditions - 1
Date Name
09/20/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Conditions

Permit Number - T22CM07013
Permit Status: Inspections complete
Permit Description: R - - SYSTEM SIZE: 4745W DC, 3770W AC- MODULES: (13) LONGI GREEN ENERGY TECHNOLOGY COLTD: LR4-60HP
Date Description Comments
09/13/2022 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: T22CM07013
Permit Description: R - - SYSTEM SIZE: 4745W DC, 3770W AC- MODULES: (13) LONGI GREEN ENERGY TECHNOLOGY COLTD: LR4-60HP
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/26/2023 RSBU - Building Final Passed
05/26/2023 COT - RSEL - Electrical Final Passed
11/01/2023 BULD - Electrical Clearance Passed Approved, DGC Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_CHAVARIN RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
2_CHAVARIN SPEC SHEETS_V1.PDF DOCUMENTS VIEW
2_CHAVARIN STRUCTURAL LETTER-CALCS_V1.PDF DOCUMENTS VIEW
CONS-2_CHAVARIN PLAN SET_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GC LETTER.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
SPECS.PDF DOCUMENTS VIEW
PLANS.PDF DOCUMENTS VIEW