Permit: T22CM07007
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1230 S SAN FELIPE DR
Address NEW:
1230 S SAN FELIPE DR
Apply Date:
09/13/2022
Applicant:
Ana Chavez
Description:
SFR
Permit Reviews
Permit Number - T22CM07007
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/13/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/04/2022 | COMPLETED |
| 03/23/2023 | RESIDENTIAL NEW DWELLING v.4 | 04/18/2023 | APPROVED |
| 01/09/2023 | RESIDENTIAL NEW DWELLING v.2 | 02/07/2023 | REQUIRES RESUBMIT |
| 12/02/2022 | RESIDENTIAL NEW DWELLING v.1 | 12/15/2022 | REQUIRES RESUBMIT |
| 04/18/2023 | RESTAMP - RESIDENTIAL v.1 | 04/19/2023 | APPROVED |
| 03/05/2023 | RESIDENTIAL NEW DWELLING v.3 | 03/15/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM07007
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 05/04/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
| 04/21/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 02/06/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM07007
Permite Description: SFR
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2023 | COT - RSME - Mechanical Final | N/A | Not Ready | not ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM07007
Permit Description: SFR
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2023 | COT - RSPL - Yard Water Line | Passed | Approved. Corrections have been made. 6/6/2023 | |
| 06/13/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/13/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar per plan. Okay for concrete placement in footings and slab. 6/13/2023 | |
| 06/13/2023 | COT - RSBU - Preslab | Passed | Rebar per plan. Okay for concrete placement in footings and slab. 6/13/2023 | |
| 07/07/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/02/2023 | COT - RSPL - Rough Soil | Passed | ||
| 08/07/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 08/29/2023 | COT - RSEL - Electrical Final | Passed | ||
| 08/29/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 08/29/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/18/2023 | ENGR Engineering Final | Passed | ||
| 09/18/2023 | COT - RSME - Mechanical Final | Passed | 9/18/23: A/C is installed and operational. Okay to issue Certificate of Occupancy once all other required inspections are completed. | |
| 09/18/2023 | SITE - Zoning Final | Passed | ||
| 10/04/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Duplicate inspection. 10/4/2023 | |
| 10/04/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/04/2023 | COT - RSEL - Electrical Underground | Passed | Duplicate inspection. 10/4/2023 | |
| 10/04/2023 | COT - RSPL - Sewer | Passed | Duplicate inspection. 10/4/2023 | |
| 10/04/2023 | RSBU - Building Final | Passed | Approved. 10/4/2023 | |
| 10/04/2023 | COT - RSBU - Roof Nailing | Passed | Duplicate inspection. 10/4/2023 |