Permit: T22CM06993
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
6821 E VIA OLMEDA
Address NEW:
6821 E VIA OLMEDA
Apply Date:
09/13/2022
Applicant:
Shawna Zimbelman
Description:
SFR LE23002 T22-M0057
Outstanding Activity Conditions
Permit Number - T22CM06993
Permit Status: Issued
Permit Description: SFR LE23002 T22-M0057
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/29/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - T22CM06993
Permit Status: Issued
Permit Description: SFR LE23002 T22-M0057
| Date | Description | Comments |
|---|---|---|
| 09/13/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 09/13/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 09/13/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/13/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-098/P22WP00026, THE PUBLIC OFFSITE SEWER G-2020-058/P21WP00065 FOR PARCEL 3, THE PUBLICOFFSITE SEWER G-20-20-101/P21WP00064 FOR PARCEL 4, AND THE PUBLIC SEWER G-2020-090/P21WP00062 FOR PARCEL 5, IS ACCEPTED AND RELEASED BY PCRWRD | |
| 07/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/11/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06993
Permite Description: SFR LE23002 T22-M0057
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06993
Permit Description: SFR LE23002 T22-M0057
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 10/13/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 10/20/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
| 10/20/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
| 10/20/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
| 10/20/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
| 01/17/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 01/17/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 03/10/2023 | COT - RSEL - Construction Power | Passed | Clearance for TEP ECO. 3/10/2023 | |
| 03/17/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/17/2023 | COT - LCBU - Framing | Passed | ||
| 03/21/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 03/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/21/2023 | RSME - Mechanical Progress | Passed | ||
| 03/24/2023 | COT - RSPL - Sewer | Passed | Pass | |
| 04/03/2023 | COT - HCBU - Interior Shear Bracing | Passed | 4-3-23: Drywall is complete. Interior shear walls are properly screwed off | |
| 06/13/2023 | COT - BULD - SWG Clearance | Passed | ||
| 07/11/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 07/11/2023 | COT - RSEL - Electrical Final | Passed | ||
| 07/11/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/11/2023 | COT - RSME - Mechanical Final | Passed | ||
| 07/11/2023 | RSBU - Building Final | Passed | 7/7/23: thermostat must be 54" above floor per plans. | |
| 07/11/2023 | ENGR Engineering Final | Passed |