Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
09/12/2022
Applicant:
Kevin Flaherty
Description:
DUPLEX CASITA1X1 T20-M0044

Permit Reviews

Permit Number - T22CM06978
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
Start Date Submittal Complete Date Status  
09/16/2022 OTHER 10/19/2022 COMPLETED Review Details
05/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/08/2024 APPROVED Review Details

Conditions

Permit Number - T22CM06978
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
Date Description Comments
09/12/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
09/12/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM06978
Permite Description: DUPLEX CASITA1X1 T20-M0044
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/29/2023 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Not Applicable
04/29/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable
04/29/2024 RSME - Mechanical Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: T22CM06978
Permit Description: DUPLEX CASITA1X1 T20-M0044
Total Completed Inspections - 21
Date Description Inspector Results Comments
11/17/2022 COT - RSPL - Rough Soil Passed
11/28/2022 COT - RSEL - Electrical Underground Passed
11/28/2022 COT - RSBU - Preslab Passed
12/21/2022 COT - RSPL - Sewer Passed
03/29/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
06/20/2023 COT - RSPL - Yard Water Line Passed 6/20/23: ok to back-fill
10/30/2023 COT - RSBU - Roof Nailing Passed
10/30/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/29/2023 COT - RSEL - Grounding/Bonding Passed
12/29/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/29/2023 COT - LCBU - Framing Passed
12/29/2023 COT - LCPL - Plumbing Intermediate Passed
12/29/2023 COT - RSEL - Service Upgrade Passed Two meters 22, and 24.
2/1/24 clerance resent
01/19/2024 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
04/01/2024 BULD - Electrical Clearance Passed two meters 22/24
04/29/2024 COT - RSEL - Electrical Final Passed
04/29/2024 COT - RSPL - Plumbing Final Passed
04/29/2024 RSBU - Building Final Passed
04/29/2024 COT - RSEL - Outdoor Lighting Passed
04/29/2024 COT - RSME - Mechanical Final Passed
05/17/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
137696 PT UNIT 24 COMPLETE-2024-05-06_V1.PDF DOCUMENTS VIEW
137697 PT UNIT 22 COMPLETE-2024-05-06_V1.PDF DOCUMENTS VIEW
TRUSS CALCS CASITAS 1X1_V1.PDF DOCUMENTS VIEW
TRUSS LAYOUT CASITAS 1X1_V1.PDF DOCUMENTS VIEW
1_SIC BUILDING 22.PDF DOCUMENTS VIEW
APPLICATIONS.PDF DOCUMENTS VIEW
SITE PLAN BUILDINGS 21-25.PDF DOCUMENTS VIEW
WATER PLANS - BUILDINGS 21-25.PDF DOCUMENTS VIEW
1_ SIC BUILDING 24.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW