Permit: T22CM06936
Permit Details
Apply Date:
09/09/2022
Applicant:
Denise Dunning
Description:
SFR F60C22 T22-M0020
Permit Reviews
Permit Number - T22CM06936
Permit Status: Issued
Permit Description: SFR F60C22 T22-M0020
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/09/2022 | OTHER | 09/16/2022 | COMPLETED |
12/04/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/06/2023 | APPROVED |
05/31/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/20/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - T22CM06936
Permit Status: Issued
Permit Description: SFR F60C22 T22-M0020
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/09/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Conditions
Permit Number - T22CM06936
Permit Status: Issued
Permit Description: SFR F60C22 T22-M0020
Date | Description | Comments |
---|---|---|
09/09/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
09/09/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
12/06/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
09/09/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. | |
12/06/2023 | Post-Tension Inspection Report is required. | |
12/06/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06936
Permite Description: SFR F60C22 T22-M0020
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/23/2023 | COT - RSPL - Plumbing Final | N/A | Canceled | |
10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06936
Permit Description: SFR F60C22 T22-M0020
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/12/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
10/12/2022 | COT - RSPL - Sewer | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
10/12/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
10/20/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/19/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR isolate ufer from all metal by 2or more inches Cancel other inspections} |
|
10/20/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/19/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR. Box and wrap has not started} | |
10/20/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/20/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
02/07/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
02/07/2023 | COT - RSBU - Roof Nailing | Passed | ||
03/02/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
03/02/2023 | COT - LCBU - Framing | Passed | ||
03/02/2023 | RSME - Mechanical Progress | Passed | ||
03/02/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
03/03/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
03/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
03/16/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
05/23/2023 | COT - BULD - SWG Clearance | Passed | ||
05/24/2023 | COT - RSPL - Plumbing Final | Passed | ||
05/24/2023 | RSBU - Building Final | Passed | ||
05/24/2023 | COT - FCON - Fire - Final | Passed | ||
05/24/2023 | ENGR Engineering Final | Passed | ||
05/24/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
05/24/2023 | COT - RSEL - Electrical Final | Passed | ||
05/24/2023 | COT - RSME - Mechanical Final | Passed |