Permit: T22CM06931
Permit Details
Apply Date:
09/09/2022
Applicant:
Mark Alteri
Description:
SFR PVCS1041 T22-M0050
Permit Reviews
Permit Number - T22CM06931
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/09/2022 | OTHER | 10/12/2022 | COMPLETED |
06/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/23/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM06931
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/22/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - T22CM06931
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Date | Description | Comments |
---|---|---|
09/09/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
12/09/2022 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
09/09/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM06931
Permite Description: SFR PVCS1041 T22-M0050
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM06931
Permit Description: SFR PVCS1041 T22-M0050
Total Completed Inspections - 25
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/09/2023 | COT - RSPL - Yard Water Line | Passed | ||
03/09/2023 | COT - RSPL - Sewer | Passed | ||
03/09/2023 | COT - RSPL - Rough Soil | Passed | ||
03/14/2023 | COT - RSBU - Preslab | Passed | ||
03/14/2023 | COT - RSEL - Electrical Underground | Passed | ||
03/14/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
03/14/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/04/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/25/2023 | COT - RSBU - Roof Nailing | Passed | ||
04/27/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
04/27/2023 | COT - RSEL - Construction Power | Passed | ||
04/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/28/2023 | COT - LCBU - Framing | Passed | ||
04/28/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
05/12/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
05/12/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/14/2023 | COT - RSPL - Gas Pressure Test | Passed | Gas-line is under pressure, valve are installed on all gas pipes at appliance locations. Okay to install meter and turn on gas. | |
08/14/2023 | COT - RSPL - Plumbing Final | Passed | Electrical, mechanical, plumbing and construction are complete. Okay to issue Certificate of Occupancy once Fire and Site Engineering have completed their inspections. | |
08/14/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/14/2023 | RSBU - Building Final | Passed | Electrical, mechanical, plumbing and construction are complete. Okay to issue Certificate of Occupancy once Fire and Site Engineering have completed their inspections. | |
08/14/2023 | RSME - Mechanical Progress | Passed | House is complete, a/c is working perfectly. | |
08/14/2023 | ENGR Engineering Final | Passed | ||
08/14/2023 | COT - RSME - Mechanical Final | Passed | Electrical, mechanical, plumbing and construction are complete. Okay to issue Certificate of Occupancy once Fire and Site Engineering have completed their inspections. | |
08/14/2023 | COT - RSEL - Electrical Final | Passed | Electrical, mechanical, plumbing and construction are complete. Okay to issue Certificate of Occupancy once Fire and Site Engineering have completed their inspections. | |
08/14/2023 | COT - BULD - SWG Clearance | Passed | Gas-line is under pressure, valve are installed on all gas pipes at appliance locations. Okay to install meter and turn on gas. |