Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Withdrawn
Type:
Residential Building - One or Two Family
Apply Date:
09/09/2022
Applicant:
Paul Richard
Description:
Withdrawn - 02/13/23 - SFR CVPLAN3 T22-M0044

Permit Reviews

Permit Number - T22CM06927
Permit Status: Withdrawn
Permit Description: Withdrawn - 02/13/23 - SFR CVPLAN3 T22-M0044
Start Date Submittal Complete Date Status  
09/09/2022 OTHER 10/12/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T22CM06927
Permit Status: Withdrawn
Permit Description: Withdrawn - 02/13/23 - SFR CVPLAN3 T22-M0044
Total Outstanding Activity Conditions - 3
Date Name
09/09/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
09/09/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/09/2022 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.

Conditions

Permit Number - T22CM06927
Permit Status: Withdrawn
Permit Description: Withdrawn - 02/13/23 - SFR CVPLAN3 T22-M0044
Date Description Comments
09/09/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Withdrawn
Permit Number: T22CM06927
Permite Description: Withdrawn - 02/13/23 - SFR CVPLAN3 T22-M0044
Total Outstanding Inspections - 21
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - RSBU - Roof Nailing N/A Not Ready
10/26/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready
10/27/2022 COT - RSME - Mechanical Final N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - RSBU - Preslab N/A Not Ready
10/27/2022 RSBU - Building Final N/A Not Ready
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
10/27/2022 COT - RSEL - Outdoor Lighting N/A Not Ready
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready
10/26/2022 COT - RSBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - RSPL - Sewer N/A Not Ready
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
10/26/2022 COT - RSPL - Rough Soil N/A Not Ready
10/27/2022 RSME - Mechanical Progress N/A Not Ready
10/26/2022 COT - RSPL - Gas Pressure Test N/A Not Ready
10/26/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready
10/27/2022 COT - RSEL - Electrical Final N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Documents

File Name Document Type  
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW