Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM06880
Permit Details
Apply Date:
09/07/2022
Applicant:
Description:
SFR LENNLE4005 T22-M0049
Outstanding Activity Conditions
Permit Number - T22CM06880
Permit Status: Issued
Permit Description: SFR LENNLE4005 T22-M0049
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
09/07/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
09/07/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-90/P21WP00062 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06880
Permite Description: SFR LENNLE4005 T22-M0049
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Roof Nailing | N/A | Not Ready | |
10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06880
Permit Description: SFR LENNLE4005 T22-M0049
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/22/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/22/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} | |
09/22/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/22/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved. Shading required.} | |
10/06/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} | |
10/06/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} | |
10/06/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} | |
10/06/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} | |
11/14/2022 | COT - RSBU - Roof Nailing | Passed | ||
02/08/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
03/20/2023 | COT - RSEL - Construction Power | Passed | Clearance for TEP ECO. 3/29/2023 | |
03/20/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 3/29/2023 | |
03/28/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
03/28/2023 | COT - LCBU - Framing | Passed | ||
03/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3/29/2023: Fresh air full of water 3/29/2023: correction made |
|
03/29/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
04/10/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
04/21/2023 | COT - RSPL - Sewer | Passed | ||
07/11/2023 | COT - BULD - SWG Clearance | Passed | 7/11/23: SWG Clearance for meter only. | |
08/21/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/21/2023 | ENGR Engineering Final | Passed | ||
08/23/2023 | RSME - Mechanical Progress | Passed | ||
08/23/2023 | COT - RSME - Mechanical Final | Passed | Back porch lights till hanging, base of a/c unit must have 3" clearance above ground. | |
08/23/2023 | COT - RSEL - Electrical Final | Passed | ||
08/23/2023 | RSBU - Building Final | Passed | Back porch lights till hanging, base of a/c unit must have 3" clearance above ground. | |
08/23/2023 | COT - RSEL - Outdoor Lighting | Passed | Back porch lights till hanging, base of a/c unit must have 3" clearance above ground. |