Permit: T22CM06873
Permit Details
Apply Date:
09/07/2022
Applicant:
Shawna Zimbelman
Description:
SFR LE23004 T22-M0055
Outstanding Activity Conditions
Permit Number - T22CM06873
Permit Status: Issued
Permit Description: SFR LE23004 T22-M0055
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
07/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/13/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
09/07/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
09/07/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
09/07/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
09/07/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-098/P22WP00026, THE PUBLIC OFFSITE SEWER G-2020-058/P21WP00065 FOR PARCEL 3, THE PUBLICOFFSITE SEWER G-20-20-101/P21WP00064 FOR PARCEL 4, AND THE PUBLIC SEWER G-2020-090/P21WP00062 FOR PARCEL 5, IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06873
Permite Description: SFR LE23004 T22-M0055
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
06/26/2023 | COT - LCPL - Plumbing Intermediate | N/A | Re-inspection required | 6/21/23: Remove all insulation from house. 6/26/23: fireblock missing at top plate in garage, fireblock dead space on second floor, fireblock duct work, dwv not under test, needs nail plates at pipe by kitchen, nail plates and staple missing at second floor bedroom. |
06/26/2023 | RSME - Mechanical Progress | N/A | Re-inspection required | 6/21/23: Remove all insulation from house. 6/26/23: fireblock missing at top plate in garage, fireblock dead space on second floor, fireblock duct work, dwv not under test, needs nail plates at pipe by kitchen, nail plates and staple missing at second floor bedroom. |
06/26/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 6/21/23: Remove all insulation from house. 6/26/23: fireblock missing at top plate in garage, fireblock dead space on second floor, fireblock duct work, dwv not under test, needs nail plates at pipe by kitchen, nail plates and staple missing at second floor bedroom. |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06873
Permit Description: SFR LE23004 T22-M0055
Total Completed Inspections - 25
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/21/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} | |
09/21/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved. Shading required. } |
|
10/07/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - approved} | |
10/07/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - approved} | |
10/07/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - approved} | |
10/07/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - approved} | |
11/18/2022 | COT - RSBU - Roof Nailing | Passed | ||
01/11/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
02/23/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
03/27/2023 | COT - RSPL - Sewer | Passed | ||
06/21/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
06/26/2023 | COT - LCBU - Framing | Passed | ||
06/28/2023 | RSEL - Electrical Progress | Passed | ||
06/28/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
06/28/2023 | RSME - Mechanical Progress | Passed | ||
06/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/13/2023 | RSPL - Plumbing Progress | Passed | ||
07/13/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
09/21/2023 | COT - BULD - SWG Clearance | Passed | ||
10/04/2023 | COT - RSPL - Plumbing Final | Passed | ||
10/04/2023 | RSBU - Building Final | Passed | ||
10/04/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
10/04/2023 | COT - RSEL - Electrical Final | Passed | ||
10/04/2023 | COT - RSME - Mechanical Final | Passed | ||
10/04/2023 | ENGR Engineering Final | Passed |