Permit: T22CM06840
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
910 W CALLE BOCINA
Address NEW:
910 W CALLE BOCINA
Apply Date:
09/06/2022
Applicant:
Description:
R - Installation of 9.68 kW photovoltaic system with a 225 MPU/200A Main breaker
Outstanding Activity Conditions
Permit Number - T22CM06840
Permit Status: Issued
Permit Description: R - Installation of 9.68 kW photovoltaic system with a 225 MPU/200A Main breaker
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/16/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T22CM06840
Permit Status: Issued
Permit Description: R - Installation of 9.68 kW photovoltaic system with a 225 MPU/200A Main breaker
| Date | Description | Comments |
|---|---|---|
| 09/06/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06840
Permit Description: R - Installation of 9.68 kW photovoltaic system with a 225 MPU/200A Main breaker
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2022 | COT - RSEL - Service Upgrade | Passed | called TEP at 3:20. clear incr for future solar. | |
| 02/07/2023 | COT - RSEL - Electrical Final | Passed | ||
| 02/07/2023 | RSBU - Building Final | Passed | ||
| 02/07/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |