Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
09/06/2022
Applicant:
Description:
R - Installation of a roof mounted 5.600kW Pv System and a main panel upgrade to 225A & REV1: Relocated Equipments, Changed Equipment Models, Removed Existing PM Meter

Permit Reviews

Permit Number - T22CM06839
Permit Status: Inspections complete
Permit Description: R - Installation of a roof mounted 5.600kW Pv System and a main panel upgrade to 225A & REV1: Relocated Equipments, Changed Equipment Models, Removed Existing PM Meter
Start Date Submittal Complete Date Status  
09/06/2022 OTHER 09/19/2022 COMPLETED Review Details
03/03/2023 RESIDENTIAL SOLAR v.1 03/06/2023 APPROVED Review Details
03/28/2023 RESIDENTIAL SOLAR v.1 04/18/2023 APPROVED Review Details

Conditions

Permit Number - T22CM06839
Permit Status: Inspections complete
Permit Description: R - Installation of a roof mounted 5.600kW Pv System and a main panel upgrade to 225A & REV1: Relocated Equipments, Changed Equipment Models, Removed Existing PM Meter
Date Description Comments
09/16/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
09/06/2022 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: T22CM06839
Permit Description: R - Installation of a roof mounted 5.600kW Pv System and a main panel upgrade to 225A & REV1: Relocated Equipments, Changed Equipment Models, Removed Existing PM Meter
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/24/2023 COT - RSEL - Service Upgrade Passed
07/06/2023 RSBU - Building Final Passed
07/06/2023 BULD - Electrical Clearance Passed 7/6/23: INCR. & PV good to go.
07/06/2023 COT - RSEL - Electrical Final Passed 7/6/23: INCR. & PV good to go.

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLANS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLANS.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CORRECTED PLANS_V1.PDF DOCUMENTS VIEW
CORRECTION LETTER_V1.PDF DOCUMENTS VIEW
CONS-REV PLANS_V1.PDF DOCUMENTS VIEW
REV LETTER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW