Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
09/02/2022
Applicant:
Andrea Flood
Description:
SFR F50B22 T22-M0032

Permit Reviews

Permit Number - T22CM06805
Permit Status: Complete
Permit Description: SFR F50B22 T22-M0032
Start Date Submittal Complete Date Status  
08/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/16/2023 APPROVED Review Details

Conditions

Permit Number - T22CM06805
Permit Status: Complete
Permit Description: SFR F50B22 T22-M0032
Date Description Comments
09/02/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
09/02/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
09/02/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/16/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
09/16/2022 A Pima County Wastewater sign off required prior to issuance of permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM06805
Permite Description: SFR F50B22 T22-M0032
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/07/2023 COT - RSPL - Plumbing Final N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: T22CM06805
Permit Description: SFR F50B22 T22-M0032
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/28/2022 COT - RSPL - Yard Water Line Passed {Activity date: 09/28/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
09/28/2022 COT - RSPL - Sewer Passed {Activity date: 09/28/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
09/28/2022 COT - RSPL - Rough Soil Passed {Activity date: 09/28/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
10/17/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 10/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 10/12/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE. Maintain a min 2” clearance around ufer} ; {Activity date: 10/10/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE ufer required to be incased in min 2” of concrete.}
10/17/2022 COT - RSBU - Preslab Passed {Activity date: 10/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 10/12/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR} ; {Activity date: 10/10/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE}
10/17/2022 COT - RSEL - Electrical Underground Passed {Activity date: 10/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 10/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
10/17/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 10/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 10/12/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR} ; {Activity date: 10/10/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE}
02/09/2023 COT - RSBU - Exterior Clips/Sheathing Passed
02/09/2023 COT - RSBU - Roof Nailing Passed
04/14/2023 COT - LCBU - Framing Passed
04/14/2023 RSME - Mechanical Progress Passed
04/14/2023 COT - RSPL - Gas Pressure Test Passed
04/14/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/14/2023 COT - LCPL - Plumbing Intermediate Passed
05/02/2023 COT - HCBU - Interior Shear Bracing Passed
05/02/2023 COT - RSEL - Construction Power Passed TEP ECO
08/07/2023 COT - BULD - SWG Clearance Passed Swg clearance for meter only.
08/18/2023 COT - RSME - Mechanical Final Passed
08/18/2023 COT - RSEL - Outdoor Lighting Passed
08/18/2023 COT - RSEL - Electrical Final Passed
08/18/2023 ENGR Engineering Final Passed
08/18/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
CONS-152455 SAGUARO TRAILS PT REPORT LOT 3324_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW