Permit: T22CM06669
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
244 S AVENIDA DEL PALO FIERRO
Address NEW:
244 S AVENIDA DEL PALO FIERRO
Apply Date:
08/29/2022
Applicant:
Joanne Gallaher
Description:
SFR
Permit Reviews
Permit Number - T22CM06669
Permit Status: Issued
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/29/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 09/22/2022 | COMPLETED |
| 08/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/05/2024 | REQUIRES RESUBMIT |
| 08/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/14/2024 | APPROVED |
| 03/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/18/2025 | APPROVED |
Conditions
Permit Number - T22CM06669
Permit Status: Issued
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 09/13/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 09/13/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/22/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 09/22/2022 | A Pima County Wastewater sign off required prior to issuance of permit. | |
| 09/22/2022 | General Contractor Letter (GCL) or Owner/Builder Waiver required prior to permit issuance | |
| 04/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 04/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06669
Permite Description: SFR
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 09/13/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 09/13/2022 | RSME - Mechanical Progress | N/A | Canceled | {Activity date: 09/13/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 10/26/2022 | COT - RSPL - Rough Soil | N/A | Not Ready | |
| 10/27/2023 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 10/27/23: exterior receptacles not working |
| 10/27/2023 | RSBU - Building Final | N/A | Re-inspection required | 10/27/23: exterior receptacles not working |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06669
Permit Description: SFR
Total Completed Inspections - 18