Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
08/29/2022
Applicant:
Shawna Zimbelman
Description:
SFR LE23003 T22-M0056

Outstanding Activity Conditions

Permit Number - T22CM06655
Permit Status: Issued
Permit Description: SFR LE23003 T22-M0056
Total Outstanding Activity Conditions - 4
Date Name
07/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/13/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/29/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
08/29/2022 NO FINAL UNTIL THE PUBLIC OFFSITE SEWERG-2020-058/P21WP00065 FOR PARCEL 3, THE PUBLIC OFFSITE SEWER G-2020-101/P21WP00064 FORPARCEL 4, AND THE PUBLIC SEWER G-2020-090/P21WP00062 FOR PARCEL 5, IS ACCEPTED ANDRELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM06655
Permite Description: SFR LE23003 T22-M0056
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/05/2023 RSME - Mechanical Progress N/A Re-inspection required working side of furnace not sufficient, fresh air duct needs to be replaced
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM06655
Permit Description: SFR LE23003 T22-M0056
Total Completed Inspections - 23
Date Description Inspector Results Comments
09/26/2022 COT - RSPL - Rough Soil Passed {Activity date: 09/26/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/22/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Stack need to be filled to the top due to wet conditions in the soil.}
09/27/2022 COT - RSPL - Yard Water Line Passed {Activity date: 09/27/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/26/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Provide test for wtr line} ; {Activity date: 09/22/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Missing blue tracer wire.}
10/12/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
10/12/2022 COT - RSEL - Electrical Underground Passed {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
10/13/2022 COT - RSBU - Preslab Passed {Activity date: 10/13/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 10/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Compact AB due to loose areas.}
10/13/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 10/13/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 10/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Support rebar 3” off the ground at hold downs.}
11/18/2022 COT - RSBU - Roof Nailing Passed
11/18/2022 COT - RSBU - Exterior Clips/Sheathing Passed
02/17/2023 COT - RSEL - Construction Power Passed TEP ECO
02/27/2023 COT - RSPL - Sewer Passed okay to backfill. shading required
05/05/2023 COT - LCBU - Framing Passed
05/05/2023 COT - LCPL - Plumbing Intermediate Passed
05/05/2023 COT - RSPL - Gas Pressure Test Passed
05/12/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/12/2023 RSME - Mechanical Progress Passed
05/22/2023 COT - HCBU - Interior Shear Bracing Passed
08/11/2023 COT - BULD - SWG Clearance Passed Swg clearance for meter only.
08/21/2023 COT - RSPL - Plumbing Final Passed
08/21/2023 COT - RSEL - Electrical Final Passed
08/21/2023 COT - RSEL - Outdoor Lighting Passed
08/21/2023 COT - RSME - Mechanical Final Passed
08/21/2023 RSBU - Building Final Passed
09/07/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW