Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM06655
Permit Details
Apply Date:
08/29/2022
Applicant:
Shawna Zimbelman
Description:
SFR LE23003 T22-M0056
Outstanding Activity Conditions
Permit Number - T22CM06655
Permit Status: Issued
Permit Description: SFR LE23003 T22-M0056
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
07/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/13/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
08/29/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
08/29/2022 | NO FINAL UNTIL THE PUBLIC OFFSITE SEWERG-2020-058/P21WP00065 FOR PARCEL 3, THE PUBLIC OFFSITE SEWER G-2020-101/P21WP00064 FORPARCEL 4, AND THE PUBLIC SEWER G-2020-090/P21WP00062 FOR PARCEL 5, IS ACCEPTED ANDRELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06655
Permite Description: SFR LE23003 T22-M0056
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/05/2023 | RSME - Mechanical Progress | N/A | Re-inspection required | working side of furnace not sufficient, fresh air duct needs to be replaced |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06655
Permit Description: SFR LE23003 T22-M0056
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/26/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/26/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/22/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Stack need to be filled to the top due to wet conditions in the soil.} | |
09/27/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/27/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/26/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Provide test for wtr line} ; {Activity date: 09/22/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Missing blue tracer wire.} | |
10/12/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
10/12/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
10/13/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/13/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 10/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Compact AB due to loose areas.} | |
10/13/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/13/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 10/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Support rebar 3” off the ground at hold downs.} | |
11/18/2022 | COT - RSBU - Roof Nailing | Passed | ||
11/18/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
02/17/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
02/27/2023 | COT - RSPL - Sewer | Passed | okay to backfill. shading required | |
05/05/2023 | COT - LCBU - Framing | Passed | ||
05/05/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
05/05/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
05/12/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/12/2023 | RSME - Mechanical Progress | Passed | ||
05/22/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
08/11/2023 | COT - BULD - SWG Clearance | Passed | Swg clearance for meter only. | |
08/21/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/21/2023 | COT - RSEL - Electrical Final | Passed | ||
08/21/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/21/2023 | COT - RSME - Mechanical Final | Passed | ||
08/21/2023 | RSBU - Building Final | Passed | ||
09/07/2023 | ENGR Engineering Final | Passed |