Permit: T22CM06641
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
524 E LAGUNA ST
Address NEW:
524 E LAGUNA ST
Apply Date:
08/26/2022
Applicant:
alex enoch
Description:
SFR SINGlLUNIT T22-M0061
Permit Reviews
Permit Number - T22CM06641
Permit Status: Inspections
Permit Description: SFR SINGlLUNIT T22-M0061
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/26/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 09/30/2022 | COMPLETED |
| 09/19/2023 | RESIDENTIAL NEW DWELLING v.3 | 10/12/2023 | APPROVED |
| 08/25/2023 | RESIDENTIAL NEW DWELLING v.2 | 09/12/2023 | REQUIRES RESUBMIT |
| 03/01/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/05/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - T22CM06641
Permit Status: Inspections
Permit Description: SFR SINGlLUNIT T22-M0061
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/26/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T22CM06641
Permit Status: Inspections
Permit Description: SFR SINGlLUNIT T22-M0061
| Date | Description | Comments |
|---|---|---|
| 10/24/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/25/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: T22CM06641
Permite Description: SFR SINGlLUNIT T22-M0061
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2022 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | {Activity date: 08/26/2022; Status: Prior to Final Inspectn; Inspector: RPARSON1; Comment: Entered by RPARSON1 - PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.} |
| 09/13/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 09/13/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 01/29/2024 | RSEL - Electrical Progress | N/A | Partial Pass | Electrical panel with meter box, riser, weather head, wiring, GFCI receptacle, and breakers are installed ready for TEP to connect electrical power. TEC Clearance issued for installation of electrical power. |
Completed Inspections
Permit Status: Inspections
Permit Number: T22CM06641
Permit Description: SFR SINGlLUNIT T22-M0061
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2023 | COT - RSPL - Rough Soil | Passed | ||
| 11/20/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 11/20/2023 | COT - RSBU - Preslab | Passed | ||
| 11/20/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 01/29/2024 | BULD - Electrical Clearance | Passed | Electrical panel with meter box, riser, weather head, wiring, GFCI receptacle, and breakers are installed ready for TEP to connect electrical power. TEC Clearance issued for installation of electrical power. | |
| 01/30/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 01/30/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 02/23/2024 | COT - RSBU - Interior Shear Bracing | Passed | Duplicate inspection: Fire rated Plywood is properly installed on wall between living area and garage. | |
| 04/25/2024 | COT - RSPL - Sewer | Passed | ||
| 11/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 11/26/2024 | RSBU - Building Final | Passed | ||
| 11/26/2024 | RSEL - Electrical Progress | Passed | ||
| 11/26/2024 | RSME - Mechanical Progress | Passed | ||
| 11/26/2024 | RSPL - Plumbing Progress | Passed |