Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM06610
Permit Details
Apply Date:
08/26/2022
Applicant:
Description:
R - Installation of a 5.93 kW PV system with a 175A/2P main breaker derate which is an addition to
Permit Reviews
Permit Number - T22CM06610
Permit Status: Issued
Permit Description: R - Installation of a 5.93 kW PV system with a 175A/2P main breaker derate which is an addition to
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/26/2022 | OTHER | 09/12/2022 | COMPLETED |
10/15/2022 | REVISION - - 1ST | 10/20/2022 | ACTIVE |
Outstanding Activity Conditions
Permit Number - T22CM06610
Permit Status: Issued
Permit Description: R - Installation of a 5.93 kW PV system with a 175A/2P main breaker derate which is an addition to
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/09/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T22CM06610
Permit Status: Issued
Permit Description: R - Installation of a 5.93 kW PV system with a 175A/2P main breaker derate which is an addition to
Date | Description | Comments |
---|---|---|
08/26/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06610
Permit Description: R - Installation of a 5.93 kW PV system with a 175A/2P main breaker derate which is an addition to
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2022 | COT - RSEL - Electrical Final | Passed | clear dgc | |
11/21/2022 | RSBU - Building Final | Passed |