Permit: T22CM06568
Permit Details
Apply Date:
08/25/2022
Applicant:
Andrea Flood
Description:
SFR F50C22 T22-M0031
Outstanding Activity Conditions
Permit Number - T22CM06568
Permit Status: Issued
Permit Description: SFR F50C22 T22-M0031
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
08/25/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
08/25/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
08/25/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06568
Permit Description: SFR F50C22 T22-M0031
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/23/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/23/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/23/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/10/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
10/10/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
10/10/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
10/10/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
01/25/2023 | COT - RSBU - Roof Nailing | Passed | ||
01/25/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
02/13/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
02/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
02/13/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
02/13/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
02/13/2023 | COT - LCBU - Framing | Passed | ||
02/13/2023 | RSME - Mechanical Progress | Passed | ||
02/27/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
04/28/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance required | |
05/12/2023 | COT - RSME - Mechanical Final | Passed | ||
05/12/2023 | ENGR Engineering Final | Passed | ||
05/12/2023 | RSBU - Building Final | Passed | ||
05/12/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
05/12/2023 | COT - RSEL - Electrical Final | Passed | ||
05/12/2023 | COT - RSPL - Plumbing Final | Passed |