Permit: T22CM06512
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
727 N 9TH AV
Address NEW:
727 N 9TH AV
Apply Date:
08/23/2022
Applicant:
Brenda Huettner
Description:
SFR - with DDO
Permit Reviews
Permit Number - T22CM06512
Permit Status: Complete
Permit Description: SFR - with DDO
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/23/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 09/23/2022 | COMPLETED |
| 03/18/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/21/2023 | APPROVED |
| 12/01/2022 | RESIDENTIAL NEW DWELLING v.1 | 12/09/2022 | REQUIRES RESUBMIT |
| 01/03/2023 | RESIDENTIAL NEW DWELLING v.2 | 01/19/2023 | APPROVED |
Conditions
Permit Number - T22CM06512
Permit Status: Complete
Permit Description: SFR - with DDO
| Date | Description | Comments |
|---|---|---|
| 01/19/2023 | Contractor's active Arizona Contractor's License number for specified scope of work required prior to issuance of permit. | |
| 01/25/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM06512
Permite Description: SFR - with DDO
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2023 | RSBU - Building Final | N/A | Re-inspection required | Provide the correct size fuses for mechanical. Missing hammer arrestors at refrigerator, dishwasher and laundry room. Provide 2nd circuit at kitchen. Provide arc fault breakers per plan. Missing light in mechanical room. Provide vacuum breakers at hose bibs. Caulk toilet. 12/11/2023 |
| 12/11/2023 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | Provide the correct size fuses for mechanical. Missing hammer arrestors at refrigerator, dishwasher and laundry room. Provide 2nd circuit at kitchen. Provide arc fault breakers per plan. Missing light in mechanical room. Provide vacuum breakers at hose bibs. Caulk toilet. 12/11/2023 |
| 12/11/2023 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Provide the correct size fuses for mechanical. Missing hammer arrestors at refrigerator, dishwasher and laundry room. Provide 2nd circuit at kitchen. Provide arc fault breakers per plan. Missing light in mechanical room. Provide vacuum breakers at hose bibs. Caulk toilet. 12/11/2023 |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM06512
Permit Description: SFR - with DDO
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/2023 | COT - RSPL - Rough Soil | Passed | Ok to cover progress areas | |
| 05/02/2023 | COT - RSBU - Preslab | Passed | Ok to place concrete in progress areas | |
| 05/24/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 06/06/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Ok to cover exterior walls. | |
| 06/09/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Rough-in of electrical, mechanical,plumbing, & framing is complete. Okay to insulate, drywall, tape, and texture interior walls. | |
| 06/21/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 11/08/2023 | BULD - Electrical Clearance | Passed | Approved service panel upgrade, INCR Clearance to TEP is required for the cutover | |
| 12/11/2023 | COT - FCON - Fire - Final | Passed | ||
| 01/16/2024 | RSBU - Building Final | Passed | ||
| 01/16/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 01/16/2024 | COT - RSME - Mechanical Final | Passed | ||
| 01/25/2024 | COT - FCON - Sprinkler - Final | Passed | Not a sprinklered building. | |
| 01/25/2024 | ENGR Engineering Final | Passed |