Permit: T22CM06506
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
5318 S SIERRA PRIETA TR
Address NEW:
5318 S SIERRA PRIETA TR
Apply Date:
08/23/2022
Applicant:
Description:
SFR F60B22 T22-M0027
Permit Reviews
Permit Number - T22CM06506
Permit Status: Issued
Permit Description: SFR F60B22 T22-M0027
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/23/2022 | OTHER | 08/25/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM06506
Permit Status: Issued
Permit Description: SFR F60B22 T22-M0027
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 08/23/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
| 08/23/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - T22CM06506
Permit Status: Issued
Permit Description: SFR F60B22 T22-M0027
| Date | Description | Comments |
|---|---|---|
| 08/25/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06506
Permite Description: SFR F60B22 T22-M0027
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06506
Permit Description: SFR F60B22 T22-M0027
Total Completed Inspections - 25
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 10/12/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 10/12/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 10/12/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 10/18/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
| 10/18/2022 | COT - RSPL - Sewer | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
| 10/18/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved with pre slab} | |
| 02/01/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 02/17/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 02/17/2023 | COT - RSEL - Construction Power | Passed | ||
| 02/17/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 02/17/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 02/17/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 02/22/2023 | RSME - Mechanical Progress | Passed | ||
| 02/22/2023 | COT - LCBU - Framing | Passed | ||
| 02/22/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | corrections were made | |
| 03/07/2023 | COT - HCBU - Interior Shear Bracing | Passed | approved | |
| 05/03/2023 | COT - BULD - SWG Clearance | Passed | SWG FOR METER ONLY | |
| 05/22/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 05/22/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/22/2023 | COT - RSME - Mechanical Final | Passed | ||
| 05/22/2023 | ENGR Engineering Final | Passed | ||
| 05/22/2023 | COT - RSEL - Electrical Final | Passed | ||
| 05/22/2023 | RSBU - Building Final | Passed | ||
| 05/22/2023 | COT - FCON - Sprinkler - Final | Passed |