Permit: T22CM06469
Permit Details
Apply Date:
08/22/2022
Applicant:
Denise Dunning
Description:
SFR F50C22 T22-M0031
Permit Reviews
Permit Number - T22CM06469
Permit Status: Complete
Permit Description: SFR F50C22 T22-M0031
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/02/2023 | REQUIRES RESUBMIT |
10/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/17/2023 | APPROVED |
Conditions
Permit Number - T22CM06469
Permit Status: Complete
Permit Description: SFR F50C22 T22-M0031
Date | Description | Comments |
---|---|---|
08/22/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
08/22/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
08/22/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/17/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
10/17/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/17/2023 | ISSUED WITH PCRWRD CONDITIONS: NO FINAL UNTIL THE PUBLIC SEWER G-2020-053/P20WP00249 IS ACCEPTED AND RELEASED PCRWRD | |
08/22/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. | |
10/17/2023 | Post-Tension Inspection Report is required. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM06469
Permite Description: SFR F50C22 T22-M0031
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM06469
Permit Description: SFR F50C22 T22-M0031
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/23/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/20/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR work has not started} | |
09/23/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/20/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR work has not started} | |
09/23/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/20/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR. Work has not started} | |
09/30/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} | |
09/30/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} | |
09/30/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} | |
09/30/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} | |
11/21/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/21/2022 | COT - RSBU - Roof Nailing | Passed | ||
01/27/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
01/27/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
01/27/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
01/27/2023 | RSME - Mechanical Progress | Passed | ||
01/27/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
01/27/2023 | COT - LCBU - Framing | Passed | ||
03/06/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
05/12/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance issued | |
05/12/2023 | COT - RSPL - Plumbing Final | Passed | ||
07/21/2023 | COT - RSEL - Electrical Final | Passed | ||
07/21/2023 | ENGR Engineering Final | Passed | Complete the drainage for the site, ensure that everything drains properly from the backyard to the front complete the installation of the gates, handrail and everything else needed for this site | |
07/21/2023 | COT - RSME - Mechanical Final | Passed | ||
07/21/2023 | RSBU - Building Final | Passed | ||
07/21/2023 | COT - RSEL - Outdoor Lighting | Passed |