Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
08/22/2022
Applicant:
Denise Dunning
Description:
SFR F50C22 T22-M0031

Permit Reviews

Permit Number - T22CM06469
Permit Status: Complete
Permit Description: SFR F50C22 T22-M0031
Start Date Submittal Complete Date Status  
11/01/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/02/2023 REQUIRES RESUBMIT Review Details
10/16/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/17/2023 APPROVED Review Details

Conditions

Permit Number - T22CM06469
Permit Status: Complete
Permit Description: SFR F50C22 T22-M0031
Date Description Comments
08/22/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
08/22/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
08/22/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/17/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/17/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/17/2023 ISSUED WITH PCRWRD CONDITIONS: NO FINAL UNTIL THE PUBLIC SEWER G-2020-053/P20WP00249 IS ACCEPTED AND RELEASED PCRWRD
08/22/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.
10/17/2023 Post-Tension Inspection Report is required.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM06469
Permite Description: SFR F50C22 T22-M0031
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM06469
Permit Description: SFR F50C22 T22-M0031
Total Completed Inspections - 23
Date Description Inspector Results Comments
09/23/2022 COT - RSPL - Yard Water Line Passed {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/20/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR work has not started}
09/23/2022 COT - RSPL - Sewer Passed {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/20/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR work has not started}
09/23/2022 COT - RSPL - Rough Soil Passed {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/20/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR. Work has not started}
09/30/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
09/30/2022 COT - RSBU - Preslab Passed {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
09/30/2022 COT - RSEL - Electrical Underground Passed {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
09/30/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
11/21/2022 COT - RSBU - Exterior Clips/Sheathing Passed
11/21/2022 COT - RSBU - Roof Nailing Passed
01/27/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/27/2023 COT - RSEL - Construction Power Passed TEP ECO
01/27/2023 COT - LCPL - Plumbing Intermediate Passed
01/27/2023 RSME - Mechanical Progress Passed
01/27/2023 COT - RSPL - Gas Pressure Test Passed
01/27/2023 COT - LCBU - Framing Passed
03/06/2023 COT - HCBU - Interior Shear Bracing Passed
05/12/2023 COT - BULD - SWG Clearance Passed SWG clearance issued
05/12/2023 COT - RSPL - Plumbing Final Passed
07/21/2023 COT - RSEL - Electrical Final Passed
07/21/2023 ENGR Engineering Final Passed Complete the drainage for the site, ensure that everything drains properly from the backyard to the front complete the installation of the gates, handrail and everything else needed for this site
07/21/2023 COT - RSME - Mechanical Final Passed
07/21/2023 RSBU - Building Final Passed
07/21/2023 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
CONS-152455 - SAGUARO TRAILS LOT 3237 - PT REPORT_V1.PDF DOCUMENTS VIEW
G-2020-052 FINAL ACCEPTANCE_V1.PDF DOCUMENTS VIEW
APPROVED.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW