Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM06356
Permit Details
Apply Date:
08/18/2022
Applicant:
Sunrun Installation Services, Inc
Description:
R - - SYSTEM SIZE: 7300W DC, 5800W AC - MODULES: (20) LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR4-60HPH-365M - INVERTERS: (20) ENPHASE ENERGY: IQ7PLUS-72-2-US - RACKING: SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE
Architects:
- Same as above
Contractors:
- Sunrun Installation Services, Inc
Permit Reviews
Permit Number - T22CM06356
Permit Status: Final
Permit Description: R - - SYSTEM SIZE: 7300W DC, 5800W AC
- MODULES: (20) LONGI GREEN ENERGY TECHNOLOGY CO
LTD: LR4-60HPH-365M
- INVERTERS: (20) ENPHASE ENERGY: IQ7PLUS-72-2-US
- RACKING: SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/18/2022 | OTHER | 09/09/2022 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T22CM06356
Permit Description: R - - SYSTEM SIZE: 7300W DC, 5800W AC
- MODULES: (20) LONGI GREEN ENERGY TECHNOLOGY CO
LTD: LR4-60HPH-365M
- INVERTERS: (20) ENPHASE ENERGY: IQ7PLUS-72-2-US
- RACKING: SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/21/2022 | TEP CLEARANCE - PM | ESTEVENS | Approved | CODE DGC |
09/21/2022 | ELECTRIC - SERVICE UPGRADE | ESTEVENS | Approved | 1090.AP |
09/21/2022 | ELECTRIC - FINAL | ESTEVENS | Approved | Approved. The TEP clearance code is DGC. |
09/21/2022 | BUILDING - FINAL | ESTEVENS | Approved | Approved. The TEP clearance code is DGC. |