Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM06312
Permit Details
Apply Date:
08/17/2022
Applicant:
Richard Willard
Description:
SFR LE23006 T22-M0054
Permit Reviews
Permit Number - T22CM06312
Permit Status: Issued
Permit Description: SFR LE23006 T22-M0054
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/17/2022 | OTHER | 08/22/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM06312
Permit Status: Issued
Permit Description: SFR LE23006 T22-M0054
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
07/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/11/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
08/17/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
08/17/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
08/17/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/17/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-098/P22WP00026, THE PUBLIC OFFSITE SEWER G-2020-058/P21WP00065 FOR PARCEL 3, THE PUBLICOFFSITE SEWER G-20-20-101/P21WP00064 FOR PARCEL 4, AND THE PUBLIC SEWER G-2020-090/P21WP00062 FOR PARCEL 5, IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06312
Permite Description: SFR LE23006 T22-M0054
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06312
Permit Description: SFR LE23006 T22-M0054
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/21/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved. Shading required.} | |
09/21/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} | |
10/13/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} ; {Activity date: 10/05/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready.} | |
10/14/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/13/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 10/13/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE} ; {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} ; {Activity date: 10/05/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Missing UFER rebar. Stake UFER rebar.} | |
10/14/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Support tension cables off the ground.} ; {Activity date: 10/05/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready} | |
10/14/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/13/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE 1. Isolate ufer from all metal by min 2” and support ufer in trench 2.remove all construction debris from pad} ; {Activity date: 10/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Missing rebar in the center of reentrant, corner of floor slab.} ; {Activity date: 10/11/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE Maintain min 3" clearance of rebar and hold-downs to earth an all sides. Maintain min 2" clearance of rebar and hold downs to forms. Cancel all other inspections} ; {Activity date: 10/05/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Missing hold down plates. Rebar in footing needs to be 3” away and above ground. } |
|
11/21/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/21/2022 | COT - RSBU - Roof Nailing | Passed | ||
01/26/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
03/07/2023 | COT - RSPL - Gas Pressure Test | Passed | Approved. Holding 15 psi. | |
03/07/2023 | COT - RSPL - Rough Soil | Passed | Approved. Okay to backfill. Shading required. | |
03/07/2023 | COT - LCBU - Framing | Passed | ||
03/09/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3/9/2023 approved. Corrections were made | |
03/09/2023 | RSME - Mechanical Progress | Passed | 3/9/2023 approved. Corrections were made | |
03/20/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
03/24/2023 | COT - RSPL - Sewer | Passed | Pass | |
06/14/2023 | COT - BULD - SWG Clearance | Passed | ||
06/16/2023 | COT - RSPL - Plumbing Final | Passed | ||
06/16/2023 | COT - RSME - Mechanical Final | Passed | ||
06/16/2023 | RSBU - Building Final | Passed | 6/16/23: Missing "For Future solar use" label on deadfront of service, missing WR outlet outside at back porch, base for a/c unit needs 3" clearance from earth. | |
06/16/2023 | COT - RSEL - Electrical Final | Passed | ||
06/16/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
06/16/2023 | ENGR Engineering Final | Passed |