Permit: T22CM06302
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2509 E ALTA VISTA ST
Address NEW:
2509 E ALTA VISTA ST
Apply Date:
08/17/2022
Applicant:
Description:
R - roof mount 6.30 kW DC photovoltaic solar system; 15 AC modules, 2 branches, PV subpanel, 30A PV
Permit Reviews
Permit Number - T22CM06302
Permit Status: Complete
Permit Description: R - roof mount 6.30 kW DC photovoltaic solar system; 15 AC modules, 2 branches, PV subpanel, 30A PV
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/08/2022 | RESIDENTIAL SOLAR v.2 | 11/10/2022 | APPROVED |
| 11/01/2022 | RESIDENTIAL SOLAR v.1 | 11/01/2022 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM06302
Permit Status: Complete
Permit Description: R - roof mount 6.30 kW DC photovoltaic solar system; 15 AC modules, 2 branches, PV subpanel, 30A PV
| Date | Description | Comments |
|---|---|---|
| 08/23/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 08/17/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM06302
Permite Description: R - roof mount 6.30 kW DC photovoltaic solar system; 15 AC modules, 2 branches, PV subpanel, 30A PV
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2022 | RSEL - Electrical Progress | N/A | Not Applicable | NA |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM06302
Permit Description: R - roof mount 6.30 kW DC photovoltaic solar system; 15 AC modules, 2 branches, PV subpanel, 30A PV
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2022 | COT - RSEL - Electrical Final | Passed | Approved, DGC clearance to TEP is req'd | |
| 12/14/2022 | RSBU - Building Final | Passed | Solar | |
| 12/14/2022 | BULD - Electrical Clearance | Passed | Approved, DGC clearance to TEP is req'd |