Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
2509 E ALTA VISTA ST
Apply Date:
08/17/2022
Applicant:
Description:
R - roof mount 6.30 kW DC photovoltaic solar system; 15 AC modules, 2 branches, PV subpanel, 30A PV

Permit Reviews

Permit Number - T22CM06302
Permit Status: Complete
Permit Description: R - roof mount 6.30 kW DC photovoltaic solar system; 15 AC modules, 2 branches, PV subpanel, 30A PV
Start Date Submittal Complete Date Status  
11/08/2022 RESIDENTIAL SOLAR v.2 11/10/2022 APPROVED Review Details
11/01/2022 RESIDENTIAL SOLAR v.1 11/01/2022 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T22CM06302
Permit Status: Complete
Permit Description: R - roof mount 6.30 kW DC photovoltaic solar system; 15 AC modules, 2 branches, PV subpanel, 30A PV
Date Description Comments
08/23/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
08/17/2022 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM06302
Permite Description: R - roof mount 6.30 kW DC photovoltaic solar system; 15 AC modules, 2 branches, PV subpanel, 30A PV
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/14/2022 RSEL - Electrical Progress N/A Not Applicable NA

Completed Inspections

Permit Status: Complete
Permit Number: T22CM06302
Permit Description: R - roof mount 6.30 kW DC photovoltaic solar system; 15 AC modules, 2 branches, PV subpanel, 30A PV
Total Completed Inspections - 3
Date Description Inspector Results Comments
12/14/2022 COT - RSEL - Electrical Final Passed Approved, DGC clearance to TEP is req'd
12/14/2022 RSBU - Building Final Passed Solar
12/14/2022 BULD - Electrical Clearance Passed Approved, DGC clearance to TEP is req'd