Permit: T22CM06119
Permit Details
Apply Date:
08/10/2022
Applicant:
Andrea Flood
Description:
SFR F60B22 T22-M0027
Permit Reviews
Permit Number - T22CM06119
Permit Status: Issued
Permit Description: SFR F60B22 T22-M0027
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/10/2022 | OTHER | 08/22/2022 | COMPLETED |
08/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/16/2023 | REQUIRES RESUBMIT |
08/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/21/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM06119
Permit Status: Issued
Permit Description: SFR F60B22 T22-M0027
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
08/10/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
08/10/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Conditions
Permit Number - T22CM06119
Permit Status: Issued
Permit Description: SFR F60B22 T22-M0027
Date | Description | Comments |
---|---|---|
08/10/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/10/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06119
Permite Description: SFR F60B22 T22-M0027
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06119
Permit Description: SFR F60B22 T22-M0027
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/22/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/22/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/22/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/13/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA per Scott Fisher. Cancel all other inspections.} | |
10/06/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/06/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/06/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/06/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
11/23/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/23/2022 | COT - RSBU - Roof Nailing | Passed | ||
04/20/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
04/20/2023 | COT - RSEL - Construction Power | Passed | ||
04/20/2023 | COT - LCBU - Framing | Passed | ||
04/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/20/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
04/20/2023 | RSME - Mechanical Progress | Passed | ||
04/20/2023 | BULD - Electrical Clearance | Passed | Approved, ECO Clearance to TEP is required for the construction power | |
05/17/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
08/01/2023 | COT - BULD - SWG Clearance | Passed | Swg clearance for meter only. | |
08/29/2023 | RSBU - Building Final | Passed | ||
08/29/2023 | COT - FCON - Sprinkler - Final | Passed | Approved by C Basaldua on 8/28/2023 | |
08/29/2023 | COT - RSEL - Electrical Final | Passed | ||
08/29/2023 | COT - RSME - Mechanical Final | Passed | ||
08/29/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/29/2023 | ENGR Engineering Final | Passed |