Permit: T22CM06118
Permit Details
Apply Date:
08/10/2022
Applicant:
Denise Dunning
Description:
SFR F50A22 T22-M0021
Outstanding Activity Conditions
Permit Number - T22CM06118
Permit Status: Issued
Permit Description: SFR F50A22 T22-M0021
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
08/10/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
08/10/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
08/10/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - T22CM06118
Permit Status: Issued
Permit Description: SFR F50A22 T22-M0021
Date | Description | Comments |
---|---|---|
08/12/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
08/12/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE PERMIT. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06118
Permite Description: SFR F50A22 T22-M0021
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/22/2023 | COT - LCBU - Framing | N/A | Not Ready | Add 30” of clearance for working space at condenser unit |
02/22/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | Leak in abs at laundry room area. Add 30” of clearance for working space at condenser unit |
02/22/2023 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | not holding pressure |
02/22/2023 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | leak in abs line at laundry room |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06118
Permit Description: SFR F50A22 T22-M0021
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/28/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/28/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/29/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/29/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/28/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE. Stack empty} | |
10/10/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
10/10/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
10/10/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
10/10/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
01/05/2023 | COT - RSBU - Roof Nailing | Passed | ||
02/22/2023 | RSME - Mechanical Progress | Passed | ||
02/22/2023 | COT - RSEL - Construction Power | Passed | clearance for TEP ECO. | |
02/22/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
02/23/2023 | COT - LCBU - Framing | Passed | ||
02/23/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
03/13/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
03/13/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
03/13/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
05/16/2023 | COT - RSPL - Plumbing Final | Passed | ||
05/19/2023 | COT - RSME - Mechanical Final | Passed | ||
05/19/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
05/19/2023 | COT - RSEL - Electrical Final | Passed | ||
05/19/2023 | ENGR Engineering Final | Passed | ||
05/19/2023 | COT - BULD - SWG Clearance | Passed | SWG FOR METER ONLY | |
05/23/2023 | RSBU - Building Final | Passed |